Laserfiche WebLink
<br />~z~ <br /> <br />Table 2 <br />Redwood City Water Financing Plan <br />Current Water Facilities Fee <br /> <br /> AWVVA <br />Meter Size Capacity <br />5/8" 20 <br />3/4" 30 <br />1" 50 <br />1-1/2" 100 <br />2" 160 <br />3" 300 <br />4" 500 <br />6" 1,000 <br /> <br />Meter <br />Ratio <br /> <br />Facilities <br />Fee <br /> <br />1.0 <br />1.5 <br />2.5 <br />5.0 <br />8.0 <br />15.0 <br />25.0 <br />50.0 <br /> <br />$1,787.00 <br />2,680.50 <br />4,467.50 <br />8,935.00 <br />14,296.00 <br />26,805.00 <br />44,675.00 <br />89,350.00 <br /> <br />Fees effective since 7/1/1994. <br /> <br />Note: The City also charges a Meter Fee and Service Line Installation Fee to recover the costs <br />of installing a new meter and service line. These fees are typically based on meter size, but <br />may be calculated individually to recover the actual costs of installation. <br /> <br />BARTLE WELLS ASSOCIA rES <br />F:\Jobs\Redwood City\1921\ \Redwood City Tables 1-13-06\Facil Fee,1/13/2006,3:17 PM <br />