My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2006-01-23
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2006
>
AgdaPkt 2006-01-23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/24/2006 9:21:06 AM
Creation date
1/19/2006 3:28:21 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Date
1/23/2006
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
387
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />7c!-Z/ <br /> <br />FINANCING PLAN <br /> <br />The Recycled Water Project <br /> <br />The City is entirely reliant on one source of potable water - San Francisco's Hetch <br />Hetchy regional water system - and has, over the last six years, purchased water from the <br />Hetch Hetchy system in excess of the amount San Francisco is obligated to deliver to the City. <br />See "THE ENTERPRISE - Water Supply and Demand." The City is undertaking the Recycled <br />Water Project in order to eliminate its need to purchase more water than San Francisco is <br />contractually obligated to sell to the City. <br /> <br />The purpose of the Recycled Water Project is to provide tertiary treated non-potable, <br />recycled waste water to appropriate customers of the Enterprise for landscape irrigation and <br />industrial uses. Phase 1 of the Recycled Water Project consists of (i) improvements to the <br />existing waste water treatment facilities owned and operated by the South Bayside System <br />Authority ("SBSA"), a joint powers agency of which the City is a member, (ii) the construction of <br />a disinfection facility (chlorine contact chamber) located at the site of the SBSA treatment <br />facility, to be owned by the City and operated by SBSA, (iii) the construction of storage and <br />pumping facilities located at the site of the SBSA treatment facility, to be owned and operated <br />by the City, (iv) the acquisition and installation of new distribution pipelines throughout the water <br />service areas of the City that are east of Highway 101, (v) customer site retrofits for each <br />private or public site with a landscape irrigation meter and (vi) the installation of certain artificial <br />surfaces for athletic fields in the City. Phase 2 of the Recycled Water Project consists of the <br />acquisition and installation of new distribution pipelines throughout the water service areas of <br />the City west of Highway 101, and the construction of related additional pumping facilities. <br /> <br />The City and SBSA have entered into (i) an Agreement for Production and Delivery of <br />Recycled Water dated August 1, 2004 (the "Production Agreement"), and (ii) a Lease <br />Agreement (Recycled Water Treatment/Storage/Pumping Facility Site) dated August 1, 2004 <br />(the "Lease"). Under the Production Agreement, SBSA will be responsible for the design and <br />construction of Recycled Water Project facilities to be located on SBSA's property, including <br />those owned by the City, and the City will be responsible for the design of Recycled Water <br />Project facilities not located on SBSA's property. Upon completion of the Recycled Water <br />Project, SBSA will be obligated to deliver recycled water to the City at the times and in the <br />manner set forth in the Production Agreement. The City anticipates that SBSA will, as a result <br />of the Phase 1 of the Recycled Water Project, be able to initially deliver approximately 1,690 to <br />2,000 acre feet of recycled water per annum to the City, although the City anticipates taking <br />delivery of only 900 acre feet of recycled water per annum by Fiscal Year 2009-10. The <br />Recycled Water Project will be designed and constructed so that SBSA and the City have the <br />ability to modify the Recycled Water Project so that SBSA can increase its delivery of recycled <br />water to the City to 3,238 acre feet of recycled water per annum, consistent with the certified <br />CEQA Mitigated Negative Declaration for the Recycled Water Project. <br /> <br />Under the Lease, which is scheduled to expire December 31, 2056, the City is leasing <br />the real property from SBSA on which the disinfection facility and storage and pumping facilities <br />described above of the Recycled Water Project will be constructed. <br /> <br />The City expects that in addition to landscape irrigation users, some industrial users and <br />commercial facilities will utilize the recycled water. In the Greater Bayfront area of the City these <br />include concrete plants, materials recycling businesses and port-related activities, such as dust <br />control. Additionally, the City Council anticipates that it will, in accordance with California law, <br />be adopting a "dual plumbing" ordinance for certain new commercial construction, such as <br />office buildings, for internal toilet-flushing and self-contained cooling systems. <br /> <br />3 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.