My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2006-01-23
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2006
>
AgdaPkt 2006-01-23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/24/2006 9:21:06 AM
Creation date
1/19/2006 3:28:21 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Date
1/23/2006
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
387
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />7P- 5¿ <br /> <br />COMMERCIAL <br />(Billed Monthly) <br /> <br />Commercial Monthly Service Charge <br /> <br />Meter Size <br />5/8 inch <br />3/4 inch <br />1 inch <br />1 1/2 inch <br />2 inch <br />3 inch <br />4 inch <br />5 inch <br />6 inch <br />8 inch <br />10 inch <br /> <br />CharQe <br />$ 12.00 <br />18.00 <br />30.00 <br />60.00 <br />96.00 <br />180.00 <br />300.00 <br />600.00 <br />600.00 <br />600.00 <br />600.00 <br /> <br />Quantity Charge <br />(Unit = 100 cubic feet) <br /> <br />0 -15 Units <br />0 - 75 Units <br />75+ Units <br /> <br />$2.16 <br />2.74 <br />3.53 <br /> <br />Source: City of Redwood City - Public Works Services Department. <br /> <br />Connection and Facilities Fees. The following table sets forth the current Water System <br />schedule of connection and facilities fees for the Enterprise, which was approved in 1994. <br /> <br />Table 8 <br />Current Connection and Facilities Fees <br /> <br /> Meter Service Line Water <br /> Installation Installation Facilities Fee <br />Meter Size Fee Fee <br /> 5/8 inch $150.00 $2,250.00 $1,787.00 <br /> 3/4 inch 175.00 2,250.00 2,680.50 <br /> 1 inch 200.00 2,250.00 4,467.50 <br />1-1/2 inch 350.00 3,300.00 8,935.00 <br /> 2 inch 450.00 3,300.00 14,296.00 <br /> 3 inch 725.00 TBD-per 26,805.00 <br /> detailed <br /> estimate <br /> 4 inch 1,400.00 TBD-per 44,675.00 <br /> detailed <br /> estimate <br /> 6 inch TBD-per TBD-per 89,350.00 <br /> detailed detailed <br /> estimate estimate <br />Source: City of Redwood City - Public Works Services Department. <br /> <br />The City is currently developing a new water capacity charge that is intended to be <br />added to the existing schedule of water connection and facilities fees. The new charge is <br />expected to be designed so that new development pays its proportionate share of infrastructure <br />costs, including that associated with the Recycled Water Program. City Council consideration <br />of the proposed water capacity charge is anticipated to occur in the first six months of calendar <br /> <br />27 <br />
The URL can be used to link to this page
Your browser does not support the video tag.