My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2006-01-23
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2006
>
AgdaPkt 2006-01-23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/24/2006 9:21:06 AM
Creation date
1/19/2006 3:28:21 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Date
1/23/2006
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
387
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />::ø- d' <br /> <br />costs of the Recycled Water Project - Redwood City water rates and service charges will <br />rise significantly, driven primarily by the projected 300%+ increase (vs. a projected 280% <br />increase described in the 2004 Plan) in the wholesale cost of drinking water over the next <br />ten years, as the San Francisco Public Utilities Commission repairs and strengthens the <br />Hetch Hetchy regional water system. However, as the 2004 Financing Plan pointed out, <br />the potential rate increases without the project could be higher than with it. In addition, the <br />increased revenues will be expended on a new water supply and distribution system that <br />will last for 50 to 80 years, far beyond the 30-year debt service period. Finally, all water <br />customers will have a much more reliable water supply by 2010 - and well beyond - to <br />ensure that this essential resource is sustained for future generations. <br /> <br />Peter Ingram <br />Director, Public <br /> <br /> <br /> <br />Attachment <br />Water Financing Plan - 2006 Update <br /> <br />3 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.