My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2018-06-11 Closed and Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2018
>
AgdaPkt 2018-06-11 Closed and Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2018 4:05:50 PM
Creation date
6/7/2018 6:21:34 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
6/11/2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
689
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.2.A. - Page 1 <br />REPORT <br />To the Honorable Mayor and City Council <br />From the City Manager <br />June 11, 2018 <br />SUBJECT <br />Final Acceptance — 550 Allerton Street <br />RECOMMENDATION <br />• By Motion, accept the construction improvements for 550 Allerton Street, and <br />authorize the release of the bonds in accordance with the Subdivision Improvement <br />Agreement <br />• By Motion, approve and authorize the City Manager to execute the Assignment <br />and Assumption and First Amendment to Landscape Maintenance Agreement with <br />Premia South County, LLC and Premia 550 Owner, LLC <br />BACKGROUND <br />On November 9, 2015 the City Council approved the Improvement Agreement for the <br />550 Allerton Street Development, a 6 -story, 69,846 square feet office building. The <br />Construction Permit, approved and issued by the City, required the developer to make <br />on-site and off-site improvements. Improvements include but are not limited to: grading <br />and drainage, paving, water, fire, sanitary sewer, storm drainage, intersection <br />improvements, and joint trench utility services. The total amount of improvements <br />completed is estimated at $497,238.00. <br />During the construction of the development some of the improvements were modified to <br />deal with a stormwater issue. The project requested modifications to the drainage inlets <br />in the street. City staff agreed to this change with the condition that the project owner be <br />responsible for ongoing maintenance obligations. The attached landscape maintenance <br />agreement amendment reflects the physical changes and maintenance obligations. <br />ANALYSIS <br />The developer, Premia 550 Owner, LLC, has completed the construction of <br />improvements in accordance with the Agreement, the plans and specifications, the <br />conditions of approval and tentative map, and to the satisfaction of the City's <br />Engineering & Transportation Division. <br />The developer provided a faithful performance bond and a labor and material bond, <br />each in the amount of $497,238.00 that can be released at this time. These bonds will <br />
The URL can be used to link to this page
Your browser does not support the video tag.