My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res18 15676
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
2010-2019
>
2018
>
Res18 15676
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/6/2018 8:06:14 AM
Creation date
6/12/2018 5:11:20 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
6/11/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ATTY/RESO.0051/CC RESO APPROVING THE DOWNTOWN PLANNED COMMUNITY PERMIT – 851 MAIN ST PROJECT – EXHIBIT A <br />REV: 05-31-18 PR <br />Page 6 of 16 <br />covered from off-site view by a solid fence or masonry wall at least six feet high and in harmony with the architecture of the building(s). d. Equipment/Storage: All trash enclosures shall be completely screened and covered from off-site view by a solid fence or masonry wall at least six feet high and in harmony with the architecture of the building(s). Alternatively, the trash facilities may be placed within the building. Sewer drains, fire sprinklers, enclosures, and roofing (if outdoors) shall be provided as per City standards. e. Implementation and Reporting: Applicant and its successors and assigns shall implement the approved Discards Collection Plan and report its activities and achievements to the Public Works Department annually as requested. Parcel Map 26. Parcel Map - Obtain approval of and record a Parcel Map prior to issuance of building permit that includes the new building foundation. All parcel maps shall include the lot configuration and proposed easements and conform to the Subdivision Map Act and Chapter 30 of the Municipal Code. [SDR][ENGINEERING] 27. Agreements - Prior to Parcel Map approval, enter into the following agreements in a form acceptable to the City Attorney and the Community Development Director: [COA][ENGINEERING] a. A Landscape Maintenance Agreement for all assigned landscape areas in public rights of way, easements, and/or on property in which the City holds an interest to be maintained. Maintenance items shall include, but are not limited to, planting trees, shrubs, flowers, grass, decorative pavers, and all appurtenances including irrigation systems and pedestrian scale lighting. b. A Stormwater Treatment Measures Maintenance Agreement for all on- site stormwater treatment measures associated with the project. c. An Improvement Agreement to guarantee the installation of all improvements required of the project and to provide for payment of all City inspection and plan check charges associated with the installation of public and private improvements, including, but not limited to, streets, sanitary sewers, water, storm drains and street lights. d. A Shared Parking Covenant providing the City with assurance that the shared parking obligations under the Downtown Precise Plan will be met and that the valet parking service will be provided for the life of the project. The shared parking covenant shall be recorded against the property along with the Parcel Map. Reports and Surveys 28. Geotechnical Report - Include a geotechnical field review and reports for all grading
The URL can be used to link to this page
Your browser does not support the video tag.