My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt18 Recology
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2018
>
Agmt18 Recology
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2018 10:54:00 AM
Creation date
6/13/2018 9:59:34 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Recology San Mateo County
PROJECT NAME
Franchise Agreement Recyclable materials, organic materials and solid waste 1/1/2021 to 12/31/2035
RMP File Number
803
Date
3/26/2018
Reso Ref
15651
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
356
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ATTY/AGR.2018.054/Recology of San Mateo <br />ATTACHMENT K <br />CONTRACTOR'S COMPENSATION AND RATE SETTING PROCESS <br />Cost Eleven (2021) Contractor's Compejnag[q%, Years Twelve to Twenty -Five (2022 - 2035) <br />B. Direct Fuel Costs for All . Step One: Adjust 2021 projected Direct Fuel costs to • Step One: Annually adjust direct fuel costs by 100% of the <br />Contractor Vehicles reflect the change in the CPI -U -Motor Fuel from April 2016 Annual Index Change for the CPI -U -Motor Fuel. <br />including Collection to April 2020 using the following formula: Adjusted 2021 • Step Two: Annually adjust direct fuel costs to reflect <br />Vehicles, Support Vehicles, Direct Fuel cost = Projected 2021 Direct Fuel cost x [ 1+ service level changes by adjusting costs by 100% of the <br />and Supervisor's Vehicles (((Average CPI for May 2019 through April 2020) — average service level change in accounts, lifts, and pulls as <br />(Average CPI for May 2015 through October 2016)) / described in Table 2. <br />(Average CPI for May 2015 through April 2016)) ]. <br />• Step Two: Adjust Direct Fuel Cost amount calculated in <br />Step One to reflect service level changes using the method <br />described in Row A above for Rate Year Eleven (2021) <br />Direct -Labor Related Costs. <br />C. Other Direct Costs for • Adjust Other Direct Costs to reflect service level changes by <br />Collection Services using the method described in Row A above for Rate Year <br />Eleven (2021) Direct -Labor Related Costs. <br />Collection Services Franchise Agreement with Recology San Mateo County <br />Model Agreement for Adaptation by Member Agencies <br />REV: 03-16-18 MI <br />• Step One: Annually adjust Other Direct Costs by 100% of <br />the Annual Index Change using CPI -U. <br />• Step Two: Annually adjust Other Direct Costs to reflect <br />service level changes by adjusting costs by 100% of the <br />average service level change in accounts, lifts, and pulls as <br />described in Table 2. <br />Attachment K <br />Contractor's Compensation and Rate Setting Process <br />Page 10 of 24 <br />
The URL can be used to link to this page
Your browser does not support the video tag.