Laserfiche WebLink
Table ES-2: Phased Implementation Capital Cost and Recycled Water <br /> Supply Summary <br /> <br /> Incremental Total <br /> Fiscal Water Supply Water <br /> Year Added (AF/yr) Supply Capital Costs2 <br /> RWS GBF (AFlyr)~ RWS GBF Cost <br />2002~2003 0.0 0.0 50.5 1/3 treatment $ 763,000 <br /> 1/3 transmission $ 4,103,000 <br /> 1/3 pumping & storage $ 3,266,200 <br /> 1/2 Highway 101 Pipeline $ 1,120,000 <br /> 02/03 TOTAL $ 9,252,200 <br />2003/2004 32.3 0.0 82.8 2/3treatment $ 1,527,000 <br /> 2/3 transmission $ 8,206,000 <br /> 2/3 pumping & storage $ 6,532,400 <br /> 1/3 customer retrofit $ 1,030,000 <br /> 1/2 Highway 101 Pipeline $ 1,120,000 <br /> 03~04 TOTAL $18,415,400 <br />2004~2005 409.2 0.0 492.0 1/3 customer retrofit $ 1,030,000 <br /> 04~05 TOTAL $ 1,030,000 <br />2005~2006 376.9 0.0 869.0 1/3 customer retrofit $ 1,030,000 <br /> 1/2 transmission $ 3,399,000 <br /> · ~ In-system standby <br /> connection $35,000 <br /> - . , 1/3 customer retrofit $86,000 <br /> 05/06 TOTAL $ 4,550,000 <br />2006/2007 376.9 236.4 1482.2 1/2 transmission $ 3,399,000 <br /> 1/3 customer retrofit $ 86,000 <br /> 06/07 TOTAL $ 3,485,000 <br />2007/2008 0.0 236.4 1718.6 1/3 customer retrofit $ 86,000 <br /> 07/08 TOTAL $ 86,000 <br />2008~2009 0.0 236.4 ' 1954.9 08~09 TOTAL $ 0 <br />2009/2010 0.0 0.0 1954.9 09110 TOTAL $ 0 <br />201012011 0.0 0.0 1954.9 10/11 TOTAL $ 0 <br /> <br /> GRAND TOTAL $36,819,000 <br /> Note 1: Water supply includes existing First Step customers <br /> Note 2: Including treatment, storage, pumping, transmission piping, service laterals, site retrofit, <br /> engineering and construction services, administration, and 20% project contingency <br /> Table ES-2 Abbreviations: RWS - Redwood Shores Area <br /> GBF - Greater Bayfront Area <br /> <br /> Water Recycling Feasibility Study for Redwood City <br /> <br /> <br />