My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt18 R.F. MacDonald Co. (2)
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2018
>
Under 60 K
>
Agmt18 R.F. MacDonald Co. (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2018 4:46:14 PM
Creation date
7/9/2018 4:45:28 PM
Metadata
Fields
Template:
Agreement
Contractor Name
R.F. MacDonald Co.
PROJECT NAME
General Services Agreement - Boiler removal and replacement at Red Morton Community Center 1120 Roosevelt
RMP File Number
304.5
Date
6/29/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EXHIBIT A <br /> 1. Scope of Work <br /> Contractor will perform boiler removal and replacement and staff training services at Red <br /> Morton Community Center in accordance with the services described below within one year of <br /> the Effective Date. <br /> Facility Address Equipment Model Description <br /> Manufacturer <br /> Red Morton 1120 Roosevelt Camus DFNH0751 DynaFlame near- <br /> Community Center condensing hot water boiler <br /> Contractor will: <br /> • Disconnect old boiler piping, flue, gas, and electrical. <br /> • Roll the old boiler out of the boiler room through the lobby for disposal. <br /> • Roll the new boiler through the lobby into the boiler room and place on existing pad. <br /> • Run new piping to the new boiler from existing connections on the wall. <br /> • Tie into the same flue with a reducer and adapters. <br /> • Wire new boiler and primary pump. <br /> • Start up boiler and verify operation. <br /> • Increase building loop pressure to 30 psi for stable boiler operation. <br /> • Clean tip room of any tools, debris, and installation materials. <br /> • Train staff on operation of the unit. <br /> 2. Payment Terms <br /> Contractor shall provide the services outlined herein for a flat fee of $28,928. 13. This amount <br /> includes labor, expected parts, and equipment required to perform the boiler removal and <br /> replacement tasks outlined in Section 1 (Scope of Work). Fees will be billed upon completion of <br /> boiler replacement and staff training. Contractor shall submit an invoice which includes a <br /> description of the services performed. <br /> One (1) Camus DFNH0751 $12,450.00 <br /> Flue for the Boiler $1,500.00 <br /> Materials for Install $1,800.00 <br /> Labor to Remove OId Boiler and Install New Boiler $10,800.00 <br /> Estimated Freight $1,000.00 <br /> Sales Tax (8.75%) $1,378.13 <br /> Total to Supply Boiler and Install $28,928.13 <br /> Contractor will submit invoices to: <br /> City of Redwood City, Public Works Services <br /> Attention: Dan Barros <br /> 1400 Broadway Street <br /> Redwood City, CA 94063 <br /> REV: 06-18-18 MI <br /> Page 6 of 6 <br /> ATTY/AGR,2018. 130/R. F. MacDonald Co. <br />
The URL can be used to link to this page
Your browser does not support the video tag.