Laserfiche WebLink
EXHIBIT BB - 2 <br />Redwood City Phase 1a- Traffic Calming Measures 5/2/2018 <br />For Designated Intersections along Valota and Madison <br />FIRM rISIPLINE EE r <br />BELS ARCHITECTUREAND URBAN DESIGN Architecture and A/ETeam Design Management $ 62,280.00 $ 124,560.00 $ 1860840.00 <br />Blue Zones w/Dan Burdan Traffic Calming Expert I $ 30,000.00 $ 10,000.00 $ 40,000.00 <br />!Toole Design Group Roadway and Intersection Design/Engineering I $ - $ 233,534.00 $ 233,534.00 <br />iSWA Landscape i $ 30,000.00 $ 50,000.00 $ 800000.00 <br />1Mack5 Cost Estimate i $ 10,000.00 $ 15,000.00 $ 25,000.00 <br />TOTALS1 co P I r r <br />Y 8111HE Y� Y �� <br />$ 5651374.00 <br />REV: 06-15-18 VR <br />ATTY/AGR/2018.128/ELS ARCHITECTURE & URBAN DESIGN <br />