My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2018-07-23 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2018
>
AgdaPkt 2018-07-23 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2018 4:47:34 PM
Creation date
7/19/2018 7:49:46 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
7/23/2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
685
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.2.13. - Page 29 <br />3.9 TIME OF COMPLETION <br />A. Substantial Completion -- A certificate of substantial completion for the PARCS or for major <br />subsystems will not be provided until the following requirements have been satisfied as stipulated <br />in Part 3 of this section: <br />1. Applicable system or major subsystems have passed the SAT test, <br />2. All communications from equipment to CMS and City -furnished workstations has passed the <br />SAT test. <br />3. CMS produces all required reports and has passed the SAT test. <br />4. Integrated PARC system including PARCS, subsystems including alternates, validators and <br />credit card clearinghouse for payment card transactions has passed the SAT test. <br />5. Proof /Certification of PCI DSS compliance and PABP validation. <br />6. All spare parts, stock material and manuals are on site and have been approved by City. <br />7. All training is complete to City's satisfaction. <br />S. City's has been provided all test checklists, documentation and training evaluation forms. <br />B. Final Acceptance: Upon satisfactory completion of all work, tests, demonstrations and training <br />specified herein as well as completion of the SAT test as stipulated in Part 3 of this section, <br />Contractor may apply for final acceptance of PARCS system. <br />3.10 WARRANTY & EXTENDED MAINTENANCE <br />A. Warranty <br />1. The warranty period on each phased deployment of PARCS shall commence when the entire <br />please is accepted in writing by the City. <br />2, Terms of the Warranty are outlined in Exhibit C. The PARCS shall be warranted to operate in <br />full functionality for a period of at least three years from the date of acceptance. <br />B. Extended Warranty and Maintenance <br />1. The City shall have the option of purchasing extended warranty and maintenance for a period <br />of up to ten years beyond the initial warranty period according to the fees outlined in Exhibit <br />B. <br />2. Terms of the Extended Warranty and Maintenance are outlined in Exhibit C. <br />3.11 TRAINING PROGRAM <br />A. The Contractor shall provide training as outlined in the Transition Plan in Attachment 2 at a <br />location to be determined in Redwood City, California. The Contractor shall cover all travel and <br />other costs associated with training. <br />B. Contractor shall supply and keep current hard and digital copies of all operating, training and <br />repair manuals. <br />C. Contractor grants the City rights to reproduce all training and operation manuals needed for <br />staff. <br />REV; 09-10-15 VR <br />Page 26 of 61. <br />ATTY/AGR.2015.217/Scheidt & Bachmann USA, Inc. Parking Garage Equipment <br />
The URL can be used to link to this page
Your browser does not support the video tag.