My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2018-07-23 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2018
>
AgdaPkt 2018-07-23 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2018 4:47:34 PM
Creation date
7/19/2018 7:49:46 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
7/23/2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
685
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
9.A - Page 1 <br />REPORT <br />To the Honorable Mayor and City Council <br />From the City Manager <br />July 23, 2018 <br />SUBJECT <br />Neighborhood Compatibility and Design Review Process for Major Additions and New <br />Single -Family Homes & Potential Mount (Mt.) Carmel Historic District <br />RECOMMENDATION <br />Hold Study Session and Provide Comments related to Neighborhood Compatibility and <br />Design Review Process for Major Additions and New Single -Family Homes and <br />Potential Mt. Carmel Historic District <br />BACKGROUND <br />In Redwood City, hundreds of property owners improve their homes every year. Most of <br />these improvements are relatively minor, and include kitchen remodels, new roofs, <br />window replacements and other interior renovations. In addition, each year, there are <br />also dozens of major additions to single-family homes, as well as complete tear down <br />and rebuilds of homes on existing single-family lots. <br />Generally, during a good economy, the City issues more permits (both small and large), <br />than during down economic years. Given that we are going into our eighth year of a <br />growing economy, the City has received continued requests for large additions or tear <br />downs and rebuilds, particularly in neighborhoods with high property values. Attachment <br />1 to this report details the number of large additions and new home re -builds that have <br />been constructed over the past 11 years. These larger projects usually generate more <br />neighborhood concerns than smaller projects. Concerns generally focus on compatibility <br />issues, such as the size and architectural style of the home compared to neighboring <br />homes. <br />Most recently, a number of Mt. Carmel neighborhood residents have expressed <br />concerns about several new homes proposed in their neighborhood. The comments <br />have focused on the size of the homes, the style of the homes, the approval process, <br />and the need to take the potentially historical nature of the Mt. Carmel neighborhood <br />into greater consideration during the review of new homes. <br />
The URL can be used to link to this page
Your browser does not support the video tag.