Laserfiche WebLink
O?-Z6-OZ 08:33am From-RBdwood City PW$ + T-?g? P.OOS/OO8 F-85Z <br /> <br /> Task 3 - Water Quality Monitoring Program <br /> <br /> Kennedy/~enlcs Consultants will propose specific revisions to the existing <br /> sampling and analysis plan and provide a water quality monitoring program m <br /> prevent water qualit7 degradation in the distribution system and comply with <br /> regulatory requirements after the chlor~nine conversion. Kennedy/innks <br /> Consultants will consider the monitoring parameters usable to detect nitrification. <br /> This t~k will consist of the following steps; <br /> <br /> · KevieW existing testing parameters, location of sampling stations, <br /> frequency mad reporting procedures, <br /> <br /> · Idonti~y necessary improvements related to water quality monitoring, <br /> including additional sampling stations, <br /> <br /> · Recommend a rev/seat monitoring program for the distn'budon system <br /> and stooge facilities, under conditions o£cMoramlnation, and <br /> <br /> · Estimate the cost and labor n°a:luirements associated with the revised <br /> monitoring program. <br /> <br /> The deliverable associated with Task 3 will be separate chapter in the final report <br /> that contains thc review of the current monitoring program as well as the <br /> recommended new program and the costs associated with ttfis program. <br /> <br /> Task 4 - Chloramine ¢onveraion Water Quality <br /> ~$urance Plan <br /> <br /> Kennedy/$enks Consultants will prepare a dets/led Chlorsmine Conversion <br /> Water Quslity Assursnce Plan specific for the City of l~.edwood City that will <br /> discuss wazer quality deterioration processes associated with the conversion of <br /> final d/sinfectant from chlorine to cMommJnes. The Pla~ will provide methods <br /> for identifying these processes including nitrification, reducing the potential for <br /> water quality deterioradon, and for addressing nitrification in the event that it <br /> do~ occur. <br /> <br /> The deliverable for T~k 4 will be separate chapter in the final report describing <br /> the steps necassm'y to maintain high quality water throughout the City's <br /> distn'bution system. <br /> <br /> Task 5 - Report Preparation an~ Project Meetings <br /> A final report will bc developed ~hat presents the evaluation mad results <br /> associated with Task 1 through 4. This report will be developed in a draft form <br /> and submitted to RWC for review mad comvnent. In order to.obtain input from <br /> RWC az critical t/mas, meetings will be held at the following project milestone <br /> meetings will be held: <br /> <br /> A project kickoffmeeting will be held at, er the contract with RW¢ is <br /> signed, and before any work is started <br /> <br /> · A 50% project status meeting will be hem afar initial results are <br /> compiled, but before any formal report is prepared <br /> <br /> ~v,~e~m~,=~n,eee~e=~n$~*~=~-..~re~e~---. ~ I~udget and Schedule 4 <br /> <br /> <br />