My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt18 Zoppe Family, Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2018
>
Agmt18 Zoppe Family, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/7/2018 2:54:19 PM
Creation date
8/7/2018 2:54:03 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Zoppe Family Inc., an Italian Theatrical Circus
PROJECT NAME
40 shows in October 2018
RMP File Number
304
Date
8/6/2018
MO Ref
18-129
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
B) If site is not grass, Presenter to provide one load of dirt (8 cubic yards on a level <br />surface,14 c yds on a pitched surface) (baseball diamond dirt is best - 60% <br />sand, 20% clay, 20% dirt), and additional bags of shavings may be needed. <br />C) One (1) eight yard dumpster for animal waste should be placed close to <br />animal parking in the location PERFORMERS designate upon arrival. This will <br />also be used for disposal of trash from the performances and performers. If <br />local codes require trash and animal waste to remain separate, then two (2) <br />dumpsters are required. <br />4) PERFORMANCE REQUIREMENTS <br />A) Performance Space <br />A space measuring approximately 172' diameter circle (150' diameter is the <br />minimum), is required for the set-up of the tent. Additional space is required for <br />the living quarters for the performers and their animals. This space should be <br />free and clear of all obstacles, and it is preferable that the space is a grass lot. <br />CITY should make PERFORMERS aware of any underground obstacles (such <br />as water pipes, electrical or gas lines) prior to the set-up of the tent. City is <br />responsible for obtaining all licenses and permits as may be required to host <br />Performers at the designated location. <br />B) Power220 single-phase 200 amp <br />the PERFORMERS for the lighting, <br />for the performers' living quarters. <br />5) MISCELLANEOUS <br />REV: 0"5-18 RL <br />electrical service is required for use by <br />sound, and electricity for the circus tent and <br />A) Set-up Assistance <br />A minimum of 6 able-bodied persons to help with the set-up and take down of <br />the tent. Time of set-up and take down will be determined by the <br />PERFORMERS. Set-up is approx. 10 hours, Strike is approx. 6 hours; bleacher <br />assembly is approx. 6 hours. <br />B) Accommodations <br />Up to two (2) recreational vehicles may be required to be supplied by the CITY. <br />CITY will be notified no later than one (1) month prior to performance date as <br />to whether these items are in fact needed. <br />C) Ushers, Ticket -takers, Concessions <br />Performers provide ushers. If the City wishes, the City can also provide ushers. <br />The City provides concession sales, ticket takers and people to sell tickets at <br />the door. Performers sell souvenirs only. Prior to selling merchandise on the <br />premises, Performers must obtain a Business License from the City of <br />Redwood City. <br />Page 12 of 12 <br />ATTY/AGR.2018.116/Zoppe Live Performance Agreement 2018 <br />
The URL can be used to link to this page
Your browser does not support the video tag.