Laserfiche WebLink
<br />4. <br /> <br />Compliance with Rehabilitation Act <br /> <br />To the extent it is required and not otherwise exempt by <br />applicable law, under Section 504 of the Rehabilitation Act (24 CFR <br />§ 8.22) three (3) units shall be mobility accessible and an <br />additional two (2) units shall be designated as sight and hearing <br />units. If the Developer makes a good faith determination that <br />these improvements cannot be feasibly completed, the Developer <br />shall comply with 24 CFR §8. 23 (b) to make "reasonable <br />accommodations", as such term is defined in §504 of the <br />Rehabilitation Act. <br /> <br />5. <br /> <br />Lead-Based Paint <br /> <br />The use of lead-based paint is prohibited on residential <br />property. As such, this Project is required to test for lead-based <br />paint under Federal law. Title X of the Housing and Community <br />Development Act of 1992, which appears within Title 24 CFR Part 35 <br />sets forth the requirements concerning lead-based paint in <br />federally associated housing. All projects built before 1978 which <br />receive federal assistance for rehabilitation require a Lead-Based <br />Paint Inspection and Risk Assessment by an ADHS Certified Inspector <br />with random testing, to include all painted surface components, <br />dust wipe samples and soil samples. Stabilization and/or abatement <br />shall be conducted by DHS certified contractors and qualified <br />workers prescribed by law. <br /> <br />6. <br /> <br />Tenant Participation Plan <br /> <br />To the extent 24 CFR 92.303 applies to the Developer, the <br />Developer must adhere to a fair lease and grievance procedure <br />approved by the City and must provide a plan for, and follow, a <br />program of tenant participation in management decisions. Said <br />plan, if required, must be submitted to the City as a condition for <br />the issuance of the Certificate of Completion for the Project. <br /> <br />7. <br /> <br />Reportinq Requirements <br /> <br />The <br /> <br />Developer <br /> <br />shall <br /> <br />submit <br /> <br />the <br /> <br />following <br /> <br />reports <br /> <br />as <br /> <br />follows: <br /> <br />1) Direct Benefit Report. When the Project is <br />completed, as evidenced by the issuance of the <br />Certificate of Completion, and is available for rent by <br />qualified tenants, the Developer shall submit a Direct <br />Benefit Report, in substantially the same form as <br />attached to this Scope of Development as Attachment No. <br /> <br />B-2 <br /> <br />REDW\0006\DOC\001-7 <br />3/29/05 3:15 /rove <br />