My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt18 Access Communications
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2018
>
Under 60 K
>
Agmt18 Access Communications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/14/2018 2:50:05 PM
Creation date
8/14/2018 2:46:31 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Access Communications
PROJECT NAME
Installation of network cabling at Fire Stations 9, 10, 11, 12, 13, 16 and 20
RMP File Number
304.5
Date
6/28/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
7 2 Labor & <br />FD13 1" floor - Provide and install 2 (two) <br />$619.64 $1,239.28 <br />Material <br />CAT6 cables with RJ45 connectors and <br />terminate on patch panel on I' floor MDF and <br />any miscellaneous labor and materials to <br />complete this task as needed @ 619. Dollars <br />and .64 Cents per station <br />8 3 Labor & <br />FDI 3 2nd floor - Provide and install 2 (two) <br />$619.64 $1,858.92 <br />Material <br />CAT6 cables (1 on exterior) with RJ45 <br />connectors and terminate on patch panel on 1" <br />floor MDF and any miscellaneous labor and <br />materials to complete this task as needed @ <br />619. Dollars and .64 Cents per station <br />9 3 Labor & <br />FD 16 1" floor - Provide and install 3 (three) <br />$587.52 $1,762.56 <br />Material <br />CAT6 cables with RJ45 connectors and <br />terminate on patch panel on 1" floor MDF and <br />any miscellaneous labor and materials to <br />complete this task as needed @ 587. Dollars <br />and .52 Cents per station <br />10 4 Labor & <br />FD20 2"d floor - Provide and install 4(four) <br />$423.92 $1,695.68 <br />Material <br />CAT6 cables with RJ45 connectors and <br />terminate on patch panel on 1" floor MDF and <br />any miscellaneous labor and materials to <br />complete this task as needed @ 423. Dollars <br />and .92 Cents per station <br />TOTAL $15,665.69 <br />Payment will be made within thirty (30) days of receipt of an accurate invoice. <br />REV: 06-15.18 PR <br />Page 7 of 7 <br />ATTY/AGR.2018.129/Access Communications <br />
The URL can be used to link to this page
Your browser does not support the video tag.