<br /> 6.1C <br /> CITY OF REDWOOD CITY, CALIFORNIA Page 4 <br /> Public Works Services - Right-Of-Way Maintenance Division <br /> CHANGE ORDER NO: 3 <br /> Sheet: lof 2 Original Contract Amount: $569,652.00 <br /> Date: January 30, 2006 Previous Change Orders: $198,413.00 <br /> Project: 2003 - 2004 Tree Preservation and This Change Order: $19,133.00 <br /> Sidewalk Repair Pro2ram <br /> Accumulative Total: $787,198.00 <br /> To: JJR Construction, Inc. <br /> You are hereby directed to make the herein described changes from the plans and specifications or do the following <br /> described work not included in the plans and specifications of this contract. All new work herein described shall be done <br /> in accordance with the applicable provisions of the plans and specifications, except as specifically modified by this <br /> contract change order. NOTE: This change order is not effective until approved by the City. This change order includes all <br /> costs and time required to complete the additional work described herein and the contractor shall be entitled to no other <br /> compensation. <br /> DESCRIPTION OF CHANGE COST <br />1. Add 925 Sf to Bid Item No. I, Remove Sidewalk <br /> 925 SF X $2.001 SF $ 1,850.00 <br />2. Add 125 SF to Bid Item No.2 Construct Concrete Sidewalk <br /> 125 SF X 6.001 SF $ 750.00 <br />3. Add 282 SF to Bid Item No.3 Remove Driveway <br /> 282 SF X $2.25 1 SF $ 634.50 <br />4. Add 282 SF to Bid Item NO.4 Construct Concrete Driveway <br /> 282 SF X $6.25 $ 1,762.50 <br />5. Add 126 LF to Bid Item No.5, Remove Curb and Gutter <br /> 126 LF X $12.00/ LF $ 1,512.00 <br />6. Add 126 LF to Bid Item No.6, Construct Curb and Gutter <br /> 126 LF X $20.00/ LF $ 2,520.00 <br />7. Add 143 SF to Bid Item No. 10 Remove and Replace Asphalt Paving <br /> SF X $8.00/ SF $ 1,144.00 <br />8. Add 640 SF to Base Change Order item Install Rubber Sidewalk Panels <br /> 640 SF X $14.00/ SF $ 8,960.00 <br /> TOTAL $19,133.00 <br /> By reason of this proposed change a 30 day extension of time will be allowed. <br /> The adjusted contract completion date will be: December 14. 2005 <br /> Submitted By: Ralph Pacheco Title: Public Works Supervisor Date <br /> Approval Recommended: Gordon Mann Title: Public Works Superintendent Date <br /> Change Order No. 3 <br /> Page lof2 <br /> '-..",..-. .~_~".'_"'___M"'~"_.... ..,. ..__~ ...,...._.. _._...._.._.-.-_.~._.._.._-_. ..~----_.__.- .._- - "--'-'''-' <br /> --..------- -- _..---- <br />