Laserfiche WebLink
6.1.E. - Page 12 <br />EXHIBIT "A" <br />SCOPE OF SERVICES <br />PROJECT DESCRIPTION: <br />Consultant shall prepare for the City, topographic survey base maps as outlined in this <br />agreement. Base maps will be utilized during the design stage of upcoming sanitary <br />sewer replacement project to determine all necessary physical features within the <br />project limits and the project scope as listed below. <br />PROJECT LIMITS: <br />Page 9 of 18 <br />REV: 06-29-18 PR <br />ATTY/AGR.2018.151/BKF Engineers, Suveyors, Planners <br />Add'I est. <br />Add'I est. <br />length <br />length <br />beyond <br />beyond <br />Start of <br />End of <br />Estimated <br />street <br />street <br />Estimated <br />Street <br />Reference <br />Survey <br />Survey <br />length of <br />manholes <br />intersections <br />length of <br />Map <br />(From) <br />(To) <br />pipe <br />(f LF <br />(50 LF from <br />S(LF) y <br />to MH) <br />centerline of <br />centerline <br />street <br />of <br />manhole) <br />intersection) <br />MH # 208 <br />MH # 305 <br />Silver Hill <br />(Start Sta. <br />(Refer to <br />Road <br />Basin 5G <br />1+00 at <br />location <br />2,107 <br />25 <br />150 <br />2,282 <br />centerline <br />map) <br />of MH) <br />MH#410 <br />MH#243 <br />Goodwin <br />(Start Sta. <br />(Refer to <br />Ave <br />Basin 5G <br />1+00 at <br />location <br />1,767 <br />- <br />300 <br />2,067 <br />centerline <br />map) <br />of MH) <br />MH # 255 <br />MH # 249 <br />(Start Sta. <br />(Refer to <br />Fernside St <br />Basin 5G <br />1+00 at <br />location <br />322 <br />25 <br />100 <br />447 <br />centerline <br />map) <br />of MH) <br />MH # 242 <br />MH # 243 <br />Alameda <br />(Start Sta. <br />(Refer to <br />De Las <br />Basin 5G <br />1+00 at <br />location <br />184 <br />25 <br />- <br />209 <br />Pulgas <br />centerline <br />map) <br />of MH) <br />MH # 431 <br />MH # 432 <br />Mitchell <br />(Start Sta. <br />(Refer to <br />Way <br />Basin 5G <br />1+00 at <br />location <br />210 <br />25 <br />- <br />235 <br />centerline <br />map) <br />of MH) <br />MH # 433 <br />MH # 254 <br />Granger <br />(Start Sta. <br />(Refer to <br />Way <br />Basin 5G <br />1+00 at <br />location <br />808 <br />50 <br />50 <br />908 <br />centerline <br />map) <br />of MH) <br />Page 9 of 18 <br />REV: 06-29-18 PR <br />ATTY/AGR.2018.151/BKF Engineers, Suveyors, Planners <br />