My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2018-08-27 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2018
>
AgdaPkt 2018-08-27 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/16/2019 9:42:01 AM
Creation date
8/23/2018 6:18:26 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
8/27/2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
492
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.1.E. - Page 16 <br />k. Trees within the planting strip and fences. <br />3. Base map shall be completed in AutoCAD 2009 version (using the City's standard <br />CAD layers) at a scale of 1"=20'. Text information and other entities shall be <br />readable at this scale when plotted on a plan and profile sheet. Final plotted text <br />height shall be 0.1 ". <br />a. Survey station shall be at center line of street at 50 feet intervals, 25 feet stations <br />on curves, beginning at centerline of street intersections or manholes as noted <br />on the location map (see attached location map). Indicate the following items: <br />spot elevations at each 50 foot station, center line, lip of gutter or edge of <br />pavement, face of curb at flow line, back of curb, sidewalk, planting strip or <br />landscape area and right-of-way line or property line. <br />b. Base map topographic survey shall extend 25 feet beyond centerline of end <br />manholes and/or shall extend 50 feet beyond street intersections in all possible <br />directions. Please see attached location map for reference. <br />c. Survey stationing 1 +00 shall start at centerline of street intersection or centerline <br />of manholes unless otherwise noted. Please see attached location map with <br />notations of recommended starting point of Station. <br />d. Redwood City Datum shall be used in preparing the topographic survey. The <br />City will provide the location of the nearest benchmark if required. Benchmark <br />information used shall be noted on the topographic survey. North American <br />Vertical Datum of 1988 (NAVD88) shall be used. <br />e. The Consultant shall request the As-Built/Record Drawings from utility <br />companies (e.g. Comcast, PG&E, AT&T, Pacific Bell, SBSA, MCI, SFPUC, <br />Calwater, RCN, SVCW, etc.) to the selected consultant for inclusion in the survey <br />base map. The City will provide an endorsement letter stating that the Consultant <br />is requesting the information on behalf of the City. <br />f. The City will provide a sample of an approved topographic survey drawing to be <br />used as reference to conform to City requirements. <br />g. The City will provide block book drawings to be used as reference in conjunction <br />with the surveyed features stated above to determine alignment of underground <br />utilities. <br />PROJECT SCHEDULE: <br />Consultant shall complete the work within one hundred twenty (120) calendar days after <br />receiving written authorizations (the Notice to Proceed) from the City. <br />Page 13 of 18 <br />REV: 06-29-18 PR <br />ATTY/AGR.2018.151/BKF Engineers, Suveyors, Planners <br />
The URL can be used to link to this page
Your browser does not support the video tag.