My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2018-08-27 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2018
>
AgdaPkt 2018-08-27 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/16/2019 9:42:01 AM
Creation date
8/23/2018 6:18:26 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
8/27/2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
492
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.1.B. - Page 9 <br />Redwood City Code, the stricter requirement or standard shall govern, as determined by the City <br />Engineer. <br />4. Completion Date. Developer will complete the Work within one year of the Effective <br />Date, All Work will be completed in a good and workmanlike manner in accordance with accepted <br />design and construction practices and consistent with the Improvement Plans. This completion date may <br />be extended by the City Engineer in his or her sole and absolute discretion at the request of Developer, <br />which request shall be accompanied by a written assurance acceptable to the City Engineer that the <br />securities required by Section 13 skull remain enforceable throughout the term of the extension. <br />5. Estimated Cost of Work. The engincer's estimated cost of the Work is Four Million, <br />Three Hundred Seventy Eight Thousand, Two Hundred Thirty Nine Dollars ($4,378,239.00) ("Estimated <br />Cost of Work"). <br />6. Modifications to the Plans. Approval of this Agreement by City does not release <br />Developer of its responsibility to correct mistakes, errors or omissions in the Improvement Plans. If, at <br />any time, in the opinion of the City Engineer, in his reasonable discretion, the Improvement Plans are <br />deemed inadequate in any respect, Developer agrees to make such modifications, changes or revisions as <br />necessary in order to complete the Work in a good and workmanlike manner in accordance with accepted <br />design and construction standards and consistent with the Conditions and Improvement Plans. <br />7. airs. Developer agrees to repair or have repaired in a timely manner at its sole cost <br />and expense all public roads, streets, or other public or private property damaged as a result of or <br />incidental to the Work or in connection with the development of the Property, or to pay to the property <br />owner of any damaged road, street or property the full cost of such repair. In addition, Developer shall <br />obtain the written acceptance of such repair or payment from any owner whose private or public property <br />was repaired by Developer or to whom Developer has paid the full cost of such repair in accordance with <br />this Section 7. City shall be under no obligation whatsoever to accept the Work completed under this <br />Agreement until such time as all repairs have been completed or have been paid for and written <br />acceptances have been provided to the City Engineer. <br />$. Foreman or Suuerintendent. Developer shall give personal attention to the Work. A <br />competent foreman or superintendent, satisfactory to the City Engineer in his reasonable discretion with <br />authority to act for and on behalf of Developer, shall be named in writing by Developer prior to <br />commencement of the Work, shall be present on the Property during the performance of the Work and <br />may not be changed without advance notification to and the concurrence of the City Engineer. <br />9. Examination of Work. All of the Work shall be consistent with the Improvement Plans <br />and performed to the satisfaction of the City Engineer, in his reasonable discretion. City and its <br />authorized agents shall, at all times during the performance of the Work, have free access to the Property <br />and the Work and shall be allowed to examine the Work and all materials used and to be used in the <br />Work. <br />10. Citv Costs. Deposit. Developer shall pay to City the actual cost for all engineering, <br />inspection, administration, plan check, laboratory and field testing, construction, and other services <br />fiarnished by City in connection with this Agreement, including those performed by consultants under <br />contract with City ("City Costs"). Developer shall deposit with City the sum of One Hundred Fifty Five <br />Thousand and No/100 Dollars ($155,000.00) ("Deposit") to compensate City for all City Costs. <br />Developer understands that the Deposit is an estimate and further agrees to pay to City the actual cost of <br />providing such services, in accordance with the City's current fees. Developer agrees to complete <br />payment of such additional sum or sums for the services provided by City, if any, within ten (10) days <br />REV. 06-20-28 PR <br />Page 3 of 18 <br />ATTY/AGR.2018.136/601 El Camino Subdivision improvement Agreement <br />
The URL can be used to link to this page
Your browser does not support the video tag.