My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Reso PC18-11 0058 PC Reso Granting Approval of an Architectural Permit - 515 Cleveland
RedwoodCity
>
City Clerk
>
Resolutions
>
Planning Commission
>
2018
>
Reso PC18-11 0058 PC Reso Granting Approval of an Architectural Permit - 515 Cleveland
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2018 8:47:52 AM
Creation date
8/24/2018 8:47:18 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Regular
Agency Type
Planning Commission
Date
6/19/2018
Text box
ID:
1
Creator:
Created:
8/24/2018 8:47 AM
Modified:
8/24/2018 8:47 AM
Text:
https://www.municode.com/library/ca/redwood_city/codes/code_of_ordinances?nodeId=CH30SU
ID:
2
Creator:
Created:
8/24/2018 8:47 AM
Modified:
8/24/2018 8:47 AM
Text:
http://www.redwoodcity.org/departments/community-development-department/engineering-transportation/engineering/engineering-standards
ID:
3
Creator:
Created:
8/24/2018 8:47 AM
Modified:
8/24/2018 8:47 AM
Text:
https://www.municode.com/library/ca/redwood_city/codes/code_of_ordinances?nodeId=CH29STSIWOUSRI-W_ARTICIENST_S29.1ADPUWOSTSPRE
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ATTY/RESO.0058/PC RESO GRANTING APPROVAL OF AN ARCHITECURAL PERMIT – 515 CLEVELAND <br />REV: 06-26-18 PR <br />Page 10 of 17 <br />16. Electric Vehicle Charging Stations – Comply with 2016 California Green Building Standards Code, Part 11, which includes installing a listed raceway to accommodate a dedicated 208/240-volt branch circuit which terminates in close proximity to the proposed location of an EV charger for each dwelling unit. Demonstrate this on the building permit plans. [COA][ENGINEERING] Final Map 17. Final Map - Obtain approval and record a Final Map prior to building permit issuance. All final maps shall include the lot configuration and proposed easements and conform to the Subdivision Map Act and Chapter 30 of the Municipal Code. [SDR][ENGINEERING] <br /> 18. Agreements - Prior to Final Map approval, enter into the following agreements in a form acceptable to the City Attorney and the Community Development Director: [COA][ENGINEERING] a. A Landscape Maintenance Agreement for all assigned landscape areas in public rights of way, easements, and/or on property in which the City holds an interest to be maintained. Maintenance items shall include, but are not limited to, planting trees, shrubs, flowers, grass and all appurtenances including irrigation systems and pedestrian scale lighting. b. A Stormwater Treatment Measures Maintenance Agreement for all on-site stormwater treatment measures associated with the project. c. An Improvement Agreement to guarantee the installation of all improvements required of the project and to provide for payment of all City inspection and plan check charges associated with the installation of public and private improvements, including, but not limited to, streets, sanitary sewers, water, storm drains and street lights. d. CC&Rs including provisions for maintenance of and access to shared utilities, stormwater treatment facilities, surface improvements, and common areas, and an estimate of costs and proposed level of maintenance for each of the activities identified. All property owners must be members. [COA][PLANNING] <br /> Reports and Surveys <br /> 19. Geotechnical Report - Include a geotechnical field review and reports for all grading work, prepared by a licensed geotechnical engineer and in conformance with Engineering Standards, Volumes II & III, CBC, and other State regulations. This shall be submitted as part of the building permit application. [SDR][ENGINEERING] <br /> 20. As-Builts – Provide “as-built” or “record” drawings, to be submitted in paper, PDF and AutoCAD formats prior to project sign-off. [COA][ENGINEERING] Utility Infrastructure Improvements 21. Conformance with the City’s Engineering Standards – All public improvements shall be designed and constructed in accordance with the City’s Engineering Standards. [SDR][ENGINEERING] 22. Encroachment Permits – Obtain an Encroachment Permit from the Engineering and Transportation Division for work listed below. This permit shall be obtained prior to the
The URL can be used to link to this page
Your browser does not support the video tag.