Laserfiche WebLink
TASK 2: PREPARING INDIVIDUAL HISTORIC RESOURCE EVALUATIONS FOR COMMERCIAL <br />OR MULTI -FAMILY STRUCTURES <br />M -Group would complete a Historic Resource Evaluation (HRE) for commercial projects involving a <br />complete site demolition or major remodel within the Mt. Carmel neighborhood or any structure built <br />before 1940 in other areas of the City. The HRE will determine eligibility for listing on the California <br />Register of Historic Places and/or eligibility as a local resource consistent with the City's Historic <br />Preservation Ordinance. The following tasks would be completed in each HRE. <br />Tasks and Fixed -Fee Budget Commercial or Multi -Family Structures: <br />Tasks <br />Fee <br />1 <br />Project Start -Up / Site Visit. Confer with City Staff and the Project Applicant, as <br />$4,650 <br />appropriate, regarding the scope of the evaluation. Visit site for photography, <br />analysis and evaluation purposes. Site visit preparation, travel and coordination time <br />are included in this task. <br />2 <br />Develop Draft Historic Resource Evaluation. Develop a draft historic resource <br />evaluation, and, if necessary, detailing potential historic preservation alternatives <br />and mitigation measures that will lessen impacts under CEQA. M -Group will gather <br />existing historic information, and all necessary research, to inform evaluation and <br />determine existing integrity per State/Federal definitions. Resources would include, <br />but not be limited to, building permit history, Sanborn maps, Polk's directories, City <br />historical surveys, the Redwood City Library History Room, and San Mateo County <br />Historical Association records. <br />3 <br />Consultation and Final Draft. Participate in a discussion regarding draft evaluation, <br />as needed. Based on comments from City staff, M -Group will complete a final <br />document. <br />4 <br />Final Report. M -Group will prepare the Final Historic Resource Evaluation. The HRE <br />will include Alternatives and Mitigation Measures if appropriate. <br />5 <br />Attend Historic Resources Advisory Committee meeting. <br />Total Fixed Fee* <br />$4,650 <br />*Note: If a property is developed with multiple buildings, or there are other complicating factors, the <br />cost may increase depending on the amount of additional work to be done. This can be handled on a <br />case-by-case basis and additional hours can be billed at an hourly rate of $160 <br />Deliverable: Draft and Final Historic Resource Evaluations. <br />Timeframe: M -Group will be able to prepare the completed Draft HRE within 10 days of a Notice to <br />Proceed and authorization to access the property. Final HRE to be complete within 5 <br />days of comments from City Staff. <br />Page 4 of 6 <br />REV: 06-03-19 PR <br />ATTY/AGR.Amend No. 1/Metropolitan Planning Group, Inc. / Professional Serives Historical <br />