My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt18 Metropolitan Planning Group, Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2018
>
Under 60 K
>
Agmt18 Metropolitan Planning Group, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2021 2:43:08 PM
Creation date
8/28/2018 11:47:19 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Metropolitan Planning Group, Inc.
PROJECT NAME
Professional Services Mt. Carmel Historical District
RMP File Number
304.5
Date
8/24/2018
MO Ref
19-132
Task Order
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
TASK 1: PREPARING INDIVIDUAL HISTORIC RESOURCE EVALUATIONS FOR RESIDENTIAL <br />STRUCTURES <br />M-Group would complete a Historic Resource Evaluation (HRE) for residential projects involving a <br />complete site demolition or major remodel within the Mt. Carmel neighborhood or any structure <br />built before 1940 in other areas of the City. The HRE will determine eligibility for listing on the <br />California Register of Historic Places and/or eligibility as a local resource consistent with the City’s <br />Historic Preservation Ordinance. The following tasks would be completed in each HRE. <br />Tasks and Fixed-Fee Budget Single Family Residential: <br />Tasks Fee <br />1 Project Start-Up / Site Visit. Confer with City Staff regarding the scope of the <br />evaluation. Visit site for photography, analysis and evaluation purposes. Site visit <br />preparation, travel and coordination time are included in this task. <br />$2,250 <br />2 Develop Draft Historic Resource Evaluation. M-Group will gather existing historic <br />information, and all necessary research, to inform the evaluation and determine <br />existing integrity per State/Federal definitions. Resources would include, but not <br />be limited to, building permit history, Sanborn maps, Polk’s directories, City <br />historical surveys, the Redwood City Library History Room, and San Mateo <br />County Historical Association records. <br />3 Consultation and Final Draft. M-Group will complete a draft document for City <br />Staff to review. <br />4 Final Report. M-Group will prepare the Final Historic Resource Evaluation. The <br />HRE will include Alternatives and Mitigation Measures, if appropriate. <br /> Total Fixed Fee* $2,250 <br />5 OPTIONAL TASK. Attend Historic Resources Advisory Committee meeting $250 <br />*Note: If a residential property is developed with more than a single-family home and has multiple <br />buildings, the cost may increase depending on the amount of additional work to be done. This can be <br />handled on a case-by-case basis and additional hours can be billed at hourly rate of $160. <br />Deliverable: Draft and Final Historic Resource Evaluations. <br />Timeframe: M-Group will be able to prepare the completed Draft HRE within 10 days of a Notice <br />to Proceed and authorization to access the property. Final HRE to be complete <br />within 5 days of comments from City Staff. <br /> <br />Exhibit "A" <br />REV: 09-21-2021 SK <br />ATTY/AGR.2021 - Amend No. 2/Metropolitan Planning Group, Inc. (Page 3 of 6)
The URL can be used to link to this page
Your browser does not support the video tag.