My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt06 Mitchell Engineering
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2006
>
Agmt06 Mitchell Engineering
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/15/2008 2:00:29 PM
Creation date
3/8/2006 12:16:04 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Mitchell Engineering
PROJECT NAME
RWC Recycled Water Phase I
RMP File Number
304
Date
3/7/2006
MO Ref
06-025, 08-30
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Contractor has considered the physical conditions at or contiguous to the Site or <br />otherwise which may affect the cost, progress, performance or furnishing of Work, <br />as Contractor considers necessary for the performance or furnishing of Work at the <br />Contract Sum, within the Contract Time and in accordance with the other terms and <br />conditions of Contract Documents, including specifically the provisions of the <br />General Conditions. <br /> <br />C. <br /> <br />CONTRACT DOCUMENTS <br /> <br />The Contract Documents which comprise the entire agreement between City and <br />Contractor concerning the Work consist of the following: <br /> <br />A. Contract Documents consist of the following documents, including all changes, <br />addenda and modifications thereto, as listed on Table of Contents: <br /> <br />VI. <br /> <br />Section 00430 <br />Section 00520 <br />Section 00550 <br />Section 0061 0 <br />Section 00620 <br /> <br />Section 00680 <br />Section 00700 <br />Section 00800 <br /> <br />Subcontractors List Form <br />Agreement <br />Notice to Proceed <br />Faithful Performance Bond <br />Construction Labor and Material Payment <br />Bond <br />Escrow Agreement <br />General Conditions <br />Special Conditions <br /> <br />Technical Specifications Listed in the Table of Contents. <br />Drawings Listed in the Table of Contents <br /> <br />There are no Contract Documents other than those listed above in this Part VI. The <br />geotechnical, existing conditions and other information supplied under Part 6.26 of <br />Document 00700 (General Conditions) is not part of the Contract Documents. The <br />Contract Documents may only be amended, modified or supplemented as provided <br />in Document 00700 (General Conditions). <br /> <br />MISCELLANEOUS <br /> <br />A. It is understood and agreed that in no instance is any person, signing this <br />Agreement for or on behalf of City or acting as an employee or representative of <br />City, liable on this Contract, or upon any warranty of authority, or otherwise, and it is <br />further understood and agreed that liability of City is limited and confined to such <br />liability as authorized or imposed by the Contract Documents or applicable law. <br /> <br />VII. <br /> <br />Atty/Agr/2006.003 <br />012706 <br /> <br />B. <br /> <br />In entering into a public contract or a subcontract to supply goods, services or <br />materials pursuant to a public contract, the Contractor or subcontractor irrevocably <br />offers and agrees to assign to the awarding body all rights, title and interest in and <br />to all causes of action it may have under Section 4 of the Clayton Act (15 U.S.C. § <br />15) or under the Cartwright Act, (Chapter 2 (commencing with Section 16700) of <br />Part 2 of Division 7 of the Business and Professions Code), arising from purchases <br />of goods, services or materials pursuant to the public works contract or the <br />subcontract. This assignment shall be made and become effective at the time City <br />tenders final payment to the Contractor, without further acknowledgment by the <br />parties. <br /> <br />Copies of the general prevailing rates of per diem wages for each craft, <br />classification, or type of worker needed to execute the Contract, as determined by <br />Director of the State of California Department of Industrial Relations, are available <br />on the City's website (www.redwoodcitv.ora). <br /> <br />B. <br /> <br />C. <br /> <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.