My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2018-09-10 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2018
>
AgdaPkt 2018-09-10 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2018 8:39:31 AM
Creation date
9/6/2018 5:49:59 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Date
9/10/2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
468
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PROJECT SCOPE OF WORK, DELIVERABLES, DEADLINE <br />AND PAYMENT TERMS <br />Description <br />6.1.E. - Page 9 <br />Closed circuit television (CCTV) inspection of, and cleaning for that purpose, sanitary sewer <br />and/or storm drain pipelines on an on-call, as -needed basis for various City approved projects <br />and tasks. <br />SCOPE OF WORK: <br />The scope of work described herein is the minimum necessary to meet the City's objectives. The <br />Contractor is expected to expand on the scope by incorporating their expertise and proposed <br />method of approach. <br />The scope of work for the project shall include the furnishing of all labor, materials, and <br />equipment necessary to clean the sanitary sewer and/or storm drain pipelines, inspect manholes <br />and provide a closed- circuit television inspection in digital format of the sanitary sewer and/or <br />storm drain pipelines listed above. The word "clean" is defined as the removal of all <br />accumulations including sludge, dirt, sand, rocks, grease, roots, and other solid or semisolid <br />material in the pipe and manhole. <br />Cleaning <br />The Contractor shall perform a minimum of two (2) passes using the high -velocity hydraulic <br />cleaning method. The Contractor shall clean the line until the line is ready for closed-circuit <br />television inspection that's acceptable to City. No additional compensation will be made to the <br />Contractor in performing three or more passes in cleaning the sewer and/or storm drain pipelines. <br />All pipe cleaning cost method and duration shall be included in the agreed cost irrespective of <br />the type and size of the existing sewer and or storm drain pipelines. If a video and/or the capture <br />images in the database do not clearly show the pipe conditions due to inadequate clean-up or are <br />of such poor quality that the Engineer is unable to evaluate the condition of the sewer and or <br />storm drain pipelines or locate sewer service connections, the Contractor shall re -televise that <br />section of the pipe at Contractor's expense. <br />The Contractor shall protect the manholes to withstand forces generated by equipment, water, <br />and air pressure. The Contractor shall clean the sewer and/or storm drain pipelines of any <br />obstruction and debris including roots in accordance with the City's Engineering Standard <br />Technical Specifications Section 02732, "Cleaning And Closed Circuit TV Inspection of <br />Sanitary Sewer Pipe" and "Standard Specifications for Public Works Construction (Green <br />book)", latest edition. <br />Contractor shall use a jet/vacuum combination unit for cleaning all sewer and/or storm drain <br />pipelines. The combination unit shall operate at 80 gallons per minute at a pressure of 2,500 psi, <br />Page 6 of 14 <br />REV: 06-29-18 PR <br />ATTY/AGR.2018.148/National Plant Services, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.