My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2018-09-10 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2018
>
AgdaPkt 2018-09-10 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2018 8:39:31 AM
Creation date
9/6/2018 5:49:59 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Date
9/10/2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
468
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.2.A. - Page 1 <br />REPORT <br />To the Honorable Mayor and City Council <br />From the City Manager <br />September 10, 2018 <br />SUBJECT <br />Final Acceptance — Blu Harbor at 1 Uccelli Boulevard <br />RECOMMENDATION <br />By motion, accept the construction improvements for Blu Harbor at 1 Uccelli Boulevard, <br />and authorize the release of the bonds in accordance with the Subdivision Improvement <br />Agreement <br />BACKGROUND <br />On June 22, 2015 the City Council approved the Improvement Agreement for the Blu <br />Harbor at 1 Uccelli Boulevard Development which consisted of the creation of a three lot <br />subdivision for 402 residential condo units with six 9 -unit buildings, four 10 -unit <br />buildings, and a larger building wrapped around a parking structure that contains <br />remaining 308 units. The Construction Permit, approved and issued by the City, <br />required the developer to make on-site and off-site improvements. Improvements <br />include but are not limited to new domestic and recycled water mains, storm drain <br />connections, a sanitary sewer main, an 8' bike trail, and improved crosswalk to provide <br />connectivity to the Bair Island Road bike trail, and the Bay Trail. The total amount of <br />improvements completed is estimated at $8,760,611.00. <br />ANALYSIS <br />The developer, RWC Harbor Communities, LLC, has completed the construction of <br />improvements in accordance with the Agreement, the plans and specifications, the <br />conditions of approval and tentative map, and to the satisfaction of the City's <br />Engineering & Transportation Division. <br />The developer provided a faithful performance bond and a labor and material bond, <br />each in the amount of $8,760,611.00 that can be released at this time. These bonds will <br />be replaced by a maintenance bond in the amount of $876,061.10 (10%), which will be <br />held for a period of one year. The maintenance bond is a warranty in the event any of <br />the improvements fail within a one-year period. <br />
The URL can be used to link to this page
Your browser does not support the video tag.