Laserfiche WebLink
Recommendation: <br />Approve and authorize execution of an agreement with CSG Consultants, Inc. of <br />San Mateo, California, for providing Construction Management Services for both <br />BP 1 and BP 2 of the Redwood City Recycled Water Project — Phase I — Redwood <br />Shores Distribution System for the time and material cost of $754,324.00. (304) <br />MINUTE ORDER 06 -24 <br />D. Award of Contract — Redwood City Recycled Water Project — Phase I — Redwood <br />Shores Distribution System — Bid Package 1 (Radio Road, Redwood Shores <br />Parkway, Marine Parkway) <br />Recommendation: <br />Approve the Contract Documents and award the Contract for the Redwood City <br />Recycled Water Project — Phase I — Redwood Shores Distribution System — Bid <br />Package 1 (Radio Road, Redwood Shores Parkway, Marine Parkway) Project to <br />the second lowest responsible bidder, Mitchell Engineering of San Francisco, <br />California, for their bid of $4,211,475.00. (304) MINUTE ORDER 06 -25 <br />E. Asphalt Materials Purchase <br />Recommendation: <br />By Motion: <br />1. Reject the bids from Raisch Products of San Jose, CA and GraniteRock of <br />Redwood City, CA for the 2005 -2006 Asphalt Materials Purchase <br />2. Authorize re- advertising and re -bid of the 2005 -2006 Asphalt Materials <br />Purchase (701) MINUTE ORDER 06 -26 <br />6.2 Section — Final Acceptances <br />A. Final Acceptance — Schaberg Library Renovation Project <br />Recommendation: <br />Accept the Schaberg Library Renovation Project, and authorize the release of the <br />bonds and retention, less $12,500 for liquidated damages. (304) <br />MINUTE ORDER 06 -27 <br />B. Final Acceptance — Lagoon Intake Facility II Replacement Project <br />Recommendation: <br />Accept the Lagoon Intake Facility II Replacement Project, and authorize the <br />release of bonds. (304) MINUTE ORDER 06 -28 <br />REGULAR CITY COUNCIL <br />MEETING MINUTES <br />FEBRUARY 13, 2006 <br />PAGE 3 <br />MINUTE ORDER BOOK NO. 61 <br />Page No. 104 <br />