Laserfiche WebLink
County <br />Energ <br />Tho San Mateo and <br />eddy warchsrate ram <br />ratepayers <br />under <br />by San Mateo County Energy Watch <br />Ecology Action antl funtletl by Ceh/omie ratepayers under the <br />auspices of the California Public utility Commission Energy Efficiency Program <br />SAN MATEO COUNTY <br />Change Order #:Summary of Recommended Energy Efficiency Upgrades <br />I <br />1 Redwood City Police Station 2018-MLTG-COl <br />Redwood City Police Station <br />(2018) <br />1301 Maple St <br />REDWOOD CITY,CA 94063 <br />Estimated Costs Estimated Annual Payback <br />Savings <br />Total installed cost Before rebate $37,726.35 <br />Total Rebate $12,648.09 <br />Customer Service Adjustment <br />Your final cost After rebate $25,078.26 $10,835.59 2.31 Years <br />The project cost is based on rnrrent equipment prices and rebate levels and is valid for a period of 14 Clave from the date oresented. <br />Deemed kWh Demand Electricity Gas fTherml Water fccfl Sewer fccfl$ Annual S Month _$ <br />Savings t W� liSWWW <br />Utility Savings Summary 66,814.72 19.90 67,722.53 0.00 $10,835.59 $902.97 <br />By implementing these efficiency upgrades you will reduce the emissions of CO2 (carbon dioxide) into the atmosphere by 35,486.61 Ib/yr <br />Note - Savings are estimated using standard engineering calculations and are based on the hours of operation as described to the surveyor. Depending on actual usage as well as <br />changes in your electric utility rate, your savings may be higher or lower. The savings indicated above are NOT guaranteed. Construction costs may vary slightly depending on <br />fixture quantities and unforeseen conditions. <br />""Note - Based on DEER property type and measure savings values from the CPUC, this project is deemed to deliver 66814.72 kWh and 6.53 kW. The rebate offered for the project <br />is calculated based on the deemed savings values. <br />Page 2 Contractor Change Order 6/18/2018 <br />