Laserfiche WebLink
The San Mateo County Energy Watch Program is implemented by San Mateo County Energy Watch <br />Ecology Action antl funded by California ratepayers underthe 9Y SAN MATED COUNTY <br />ausp oes of the Callfomla PublicUbidy Comnnssron Energy Efficiency Program <br />Change Order #: <br />Redwood City Police Station (2018) <br />1301 Maple St <br />REDWOOD CITY,CA 94063 <br />Customer Change Order Agreement <br />Redwood City Police Station 2018-MLTG-COl <br />Contractor: <br />_YES, M Lite does accept the project. [Redwood City Police Station 2018-MLTG-001) <br />The cost of the work included in this bid proposal is not to exceed $37726.35 unless a fully executed and approved change order is received by the San Mateo county Energy Watch Program <br />Administrator. The price and specifications of this bid proposal are satisfactory and are hereby accepted by M Lite . All Work will be completed Within three weeks of the project start date shown below. <br />All work will be completed pursuant to the terms of conditions specified in the original Contractor Participation Agreement between Ecology Action and M Lite . <br />Per the San Mateo County Energy Watch Installation Standards, the undersigned contractor will submit a fully -detailed invoice, a manifest for any associated recycling fees, photos as detailed in the <br />attached Contractor Photo Punch List (only required when attached), and a Project Completion and Customer Acceptance Certificate signed by the Customer. Upon receipt of these documents and a <br />successful post -installation inspection, Ecology Action will pay the contractor the rebate portion of installed costs. It is incumbent on the contractor to collect the remaining portion of installed costs from <br />the customer. <br />Scheduled start date: <br />NO, M Lite does not accept the project. The undersigned understands that repeated project refusals will result in exclusion from the San Mateo County Energy Watch Program. If desired, please <br />comment on why the project was refused. <br />As an authorized agent representing this project, by signing below I certify the improvement or installation complies with any applicable permitting requirements and if a contractor performed the <br />Installation or Improvement, the contractor holds the appropriate licenses for the work performed. <br />License # <br />Authorized Signature (Contractor) Date <br />(print name) Company <br />Customer: <br />The a ve prices and specifications of this Change Order are satisfactory and are hereby accepted. All work to be performed under same terns and conditions as specified in the original contract <br />unless erwlse shpula(ed. C tomer C l: 25078.26 <br />�) 6/ <br />uthoriz d Signature (C sl at) Date / <br />Page 9 Contractor Change Order 6/19/2018 <br />