Laserfiche WebLink
TheMalec EnergyWatch Programisimplementedby San Mateo County Energy Watch <br />Ecology <br />gy Action and funded by C31Ra ratepayers antler the <br />auspices of the Califomia Public utility C.annevon Energy Efficiency Program <br />Contractor Photo Punch List for Redwood City Police Station 2018-MLTG-COl <br />SAN MATEO COUNTY <br />Please review the photo punch list for your project. These photos are required by the utility to make a case for K(:c1)W'Ad aetheil(ILN11 C to comply could result in a loss of rebate. <br />Contact the Installation Manager with questions. <br />Existing Fixture/Lamp <br />MH 70w 1L <br />MH 25OW 1L <br />MH 25OW 1L <br />MH 175w 1L <br />MH 175w 1L <br />T8 -4' -32w -1st <br />Gen-21amp-EI-IS-NLO <br />Photo showing Arce'lights <br />on' <br />El <br />El <br />El <br />El <br />Photo showing Lamp <br />Wattage <br />1-1 <br />El <br />El <br />El <br />El <br />El <br />Page 14 Contractor Change Order 6/18/2018 <br />Ballast label if linear <br />fluorescent <br />El <br />El <br />