My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt18 A Bright Idea DBA M Lite
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2018
>
Under 60 K
>
Agmt18 A Bright Idea DBA M Lite
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/18/2018 10:56:56 AM
Creation date
9/18/2018 10:52:32 AM
Metadata
Fields
Template:
Agreement
Contractor Name
A Bright Idea DBA M Lite
PROJECT NAME
Energy efficient lighting at City Halll, PD and CAB
RMP File Number
304.5
Date
9/17/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
The San Mateo County Energy Watch Program lss under <br />by San Mateo County Energy Watch <br />Ecology Action and iuntletl by California ratepayers under the <br />auspices of the calil Public utility commission Energy Efficiency Program <br />SAN MATEO COUNTY <br />Change Order #: Summary of Recommended Energy Efficiency Upgrades <br />1 Redwood City Community Activities Building 2018-DLTG-COl <br />Redwood City Community <br />Activities Building (2018) <br />1400 Roosevelt Ave <br />REDWOOD CITY,CA 94061 <br />Estimated Costs Estimated Annual payback <br />Savings <br />Total installed cost Before rebate $42224 <br />Total Rebate $104.00 <br />Customer Service Adjustment <br />Your final cost After rebate $318.24 $41.00- 7.76 Years <br />The nroiect cost is based on current eouinment nrices and rebate levels and is valid for a neriod of 14 Haus frnm the date presented <br />Deemed kWh Demand Electricity <br />Savings ** kW (kWhl Gas(Water fccfl Sewer (ccfl$ Annual 8 Month $ <br />Utility Savings Summary 109.60 0.06 256.26 0.00 $41.00 $3.42 <br />By implementing these efficiency upgrades you will reduce the emissions of CO2 (carbon dioxide) into the atmosphere by 134.28 Ib/yr <br />Note - Savings are estimated using standard engineering calculations and are based on the hours of operation as described to the surveyor. Depending on actual usage as well as <br />changes in your electric utility rate, your savings may be higher or lower. The savings indicated above are NOT guaranteed. Construction costs may vary slightly depending on <br />fixture quantities and unforeseen conditions. <br />**Note - Based on DEER property type and measure savings values from the CPUC, this project is deemed to deliver 109.60 kWh and 0.02 kW. The rebate offered for the project is <br />calculated based on the deemed savings values. <br />Page 3 Contractor Change Order 6/18/2018 <br />
The URL can be used to link to this page
Your browser does not support the video tag.