Laserfiche WebLink
County <br />n is <br />The San Action <br />and <br />ed by wah"oymayersu under the San Mateo County Energy Watch <br />ecology Action antl fundetl by Californiaoratepayers under the <br />auspices of the California Public utility Commission Energy Efficiency Program <br />SAN MATEO COUNTY <br />Change Order #: I Summary of Recommended Energy Efficiency Upgrades <br />1 Redwood City Community Activities Building-2018-MLTG-001 <br />Redwood City Community <br />Activities Building (2018) <br />1400 Roosevelt Ave <br />REDWOOD CITY,CA 94061 <br />Estimated Costs Estimated Annual Payback <br />Savings <br />Total installed cost Before rebate $20,522.07 <br />Total Rebate $2,418.92 <br />Customer Service Adjustment <br />Your final cost After rebate $18,103.15 $3,004,84' 6.02 Years <br />The oroiect Cost is based on current equipment prices and rebate levels and is valid for a period of 14 days from the ddatepresented. <br />Deemed kWh Demand Elec ricit Gas (Therm) Water (ccf) Sewer (ccfl$ Annual Month $ <br />Savinas .* aw (kWh) <br />Utility Savings Summary 13,285.13 5.48 18,780.27 0.00 $3,004.84 $250.40 <br />By implementing these efficiency upgrades you will reduce the emissions of CO2 (carbon dioxide) into the atmosphere by 9,840.86 Ib/yr <br />Note - Savings are estimated using standard engineering calculations and are based on the hours of operation as described to the surveyor. Depending on actual usage as well as <br />changes in your electric utility rate, your savings may be higher or lower. The savings indicated above are NOT guaranteed. Construction costs may vary slightly depending on <br />fixture quantities and unforeseen conditions. <br />"Note - Based on DEER property type and measure savings values from the CPUC, this project is deemed to deliver 13285.13 kWh and 0.99 kW. The rebate offered for the project <br />is calculated based on the deemed savings values. <br />Page 3 Contractor Change Order 6/18/2018 <br />