My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt18 A Bright Idea DBA M Lite
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2018
>
Under 60 K
>
Agmt18 A Bright Idea DBA M Lite
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/18/2018 10:56:56 AM
Creation date
9/18/2018 10:52:32 AM
Metadata
Fields
Template:
Agreement
Contractor Name
A Bright Idea DBA M Lite
PROJECT NAME
Energy efficient lighting at City Halll, PD and CAB
RMP File Number
304.5
Date
9/17/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
The San Male. Canty Energy Watch Programmtmplernented by San Mateo County Energy Watch <br />Ecology Aolion and funded by CaLfomia rarepay.a under the SAN MATEO COUNTY <br />woptoes of the Caluomm Public ulnny commmston. Energy Efficiency Program <br />Change Order #: <br />Redwood City Community Activities Building (2018) <br />1400 Roosevelt Ave <br />REDWOOD CITY,CA 94061 <br />Customer Change Order Agreement <br />Redwood City Community Activities Building-2018-MLTG-001 <br />Contractor: <br />_YES, M Lite does accept the project. [Redwood City Community Activities Building-2018-MLTG-COtj <br />The cost of the work included in this bid proposal is not to exceed $20522.07 unless a fully executed and approved change order is received by the San Mateo county Energy Watch Program <br />Administrator. The price and specifications of this bid proposal are satisfactory and are hereby accepted by M Lite . All work will be completed within three weeks of the project start date shown below. <br />All work will be completed pursuant to the lerms of conditions specified in the original Contractor Participation Agreement between Ecology Action and M Lite . <br />Per the San Mateo County Energy Watch Installation Standards, the undersigned contractor will submit a fully -detailed invoice, a manifest for any associated recycling fees, photos as detailed in the <br />attached Contractor Photo Punch List (only required when attached), and a Project Completion and Customer Acceptance Certificate signed by the Customer. Upon receipt of these documents and a <br />successful post -installation inspection, Ecology Action will pay the contractor the rebate portion of installed costs It is incumbent on the contractor to collect the remaining portion of Installed costs from <br />the customer. <br />Scheduled start date: <br />NO, M Lite does not accept the project. The undersigned understands that repeated project refusals will result in exclusion from the San Mateo County Energy Watch Program. If desired, please <br />comment on why the project was refused. <br />As an authorized agent representing this project, by signing below 1 certify the improvement or installation complies with any applicable permitting requirements and it a contractor performed the <br />Installation or improvement, the contractor holds the appropriate licenses for the work performed <br />License # <br />Authorized Signature (Contractor) <br />Date <br />(limit name) Company <br />Customer: <br />The above prices and specifications of this Change Order are satisfactory and are hereby accepted. All work to be performed under same terms and conditions as specified In the anginal contract <br />unle s therwlse stipulated ust r Cost: 18103.15 <br />Au ed Signature (yustomer) Date f r <br />Page 12 Contractor Change Order 6/18/2018 <br />
The URL can be used to link to this page
Your browser does not support the video tag.