Laserfiche WebLink
The San Mateo County Energy Watch Program is implemented by San Mateo County Energy Watch <br />Emlogy Action and funded by California ratepayers under the <br />auspices of the Cziifomia Public utility, Commission Energy Efficiency Program <br />SAN MATEO COUNTY <br />Change Order #:I Summary of Recommended Energy Efficiency Upgrades <br />1 Redwood City City Hall-2018-MLTG-CO1 <br />Redwood City City Hall (2018) <br />1017 Middlefield Rd <br />REDWOOD CITY,CA 94063 <br />Estimated Costs Estimated Annual Payback <br />Savings <br />Total installed cost Before rebate $12,260.57 <br />Total Rebate $4,464.26 <br />Customer Service Adjustment <br />Your final cost After rebate $7,796.31 $2,552.45' 3.05 Years <br />The oroiect cost is based on current eauioment prices and rebate levels and is valid for a neriod of 14 days from the date presented. <br />Deemed kWh pemand Electricity <br />vin (ICA (RMSas (Therrnl Water fccfl Sewer (ccfl$ A9IIB�1 $ N1oIlth.$ <br />Utility Savings Summary 18,839.04 5.88 15,952.77 0.00 $2,552.45 $212.70 <br />By implementing these efficiency upgrades you will reduce the emissions of CO2 (carbon dioxide) into the atmosphere by 8,359.25 Ib/yr <br />Note - Savings are estimated using standard engineering calculations and are based on the hours of operation as described to the surveyor. Depending on actual usage as well as <br />changes in your electric utility rate, your savings may be higher or lower. The savings indicated above are NOT guaranteed. Construction costs may vary slightly depending on <br />fixture quantities and unforeseen conditions. <br />"Note - Based on DEER property type and measure savings values from the CPUC, this project is deemed to deliver 18839.04 kWh and 4.83 kW. The rebate offered for the project <br />is calculated based on the deemed savings values. <br />Page 2 Contractor Change Order 6/18/2018 <br />