My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2006-03-27
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2006
>
AgdaPkt 2006-03-27
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2006 9:16:07 AM
Creation date
3/23/2006 1:37:00 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Date
3/27/2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
184
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />6-1E <br />Page 36 <br /> <br />APPENDIX 1 <br /> <br />UTILITIES AND SERVICE SYSTEMS <br />SCOPE OF SERVICES <br /> <br />CITY OF REDWOOD CITY <br />FEBRUARY 27, 2006 <br /> <br />v. <br /> <br />FEE SCHEDULE - NOLTE STAFF <br /> <br />OI;I;IC£: <br /> <br />FIEL): <br /> <br />EXl)ENSES: <br /> <br />TECHNICAL SERVICt:S <br /> <br />III Engineering Aide/Planning Aide <br />ð Project Assistant <br />íiJI Project Administrator <br />ii!I CADD Technician I <br />iI CADD Technician II <br />II CADD Technician III <br />. Senior CADD Technician/Designer <br />i1 Design Supervisor <br /> <br />$ 62.00/hour <br />$ 85.00/hour <br />$ 1O7.00/hour <br />$ 93.00/hour <br />$ 115.00 /hour <br />$ 122.00/hour <br />$ 128.00 /hour <br />$ 151.00 /hour <br /> <br />PROFESSIONAL SERVICE.<; <br />it Junior Engineer/Planner/Surveyor <br />iI Assistant Engineer/PlaIlller/Surveyor <br />" Associate Engineer/PlaIlller/Surveyor <br />ii!!I Senior EngineerlPlaIlller/Surveyor <br />a Manager <br />i1 Structural Engineer <br />ii!!I Associate <br />e Principal <br /> <br />CONSTRUCTION MANAGEMENT <br />II Junior Field Engineer <br />i1 Assistant Field Engineer <br />¡) Associate Field Engineer <br />.. Senior Field Engineer <br />ì!I Construction Manager <br /> <br />SURVEYING <br /> <br />$ 1O7.00/hour <br />$ 125.00 /hour <br />$ 146.00/hour <br />$ 157.00/hour <br />$ 177.00 /hour <br />$ 187.00 /hour <br />$ 197.00 /hour <br />$ 227.00 /hour <br /> <br />$ 98.00/hour <br />$ 110.00 /hour <br />$ 130.00 /hour <br />$ 153.00/hour <br />$ 165.00 /hour <br /> <br />It I-Person Survey Crew (GPS)(Robotic) <br />. I-Person Survey Crew <br />~ 2-Person Survey Crew <br />It 3-Person Survey Crew <br />it Senior Surveyor <br />i'! Survey Manager <br /> <br />$ 154.00 /hour <br />$ 122.00/hour <br />$ 212.00 /hour <br />$ 286.00 /hour <br />$ 157.00/hour <br />$ 165.00/hour <br /> <br />i!I Plotting and In-house Reproduction <br />~ Subsistence <br />ii! Other Expenses-Including Sub-Consultants <br />and Purchased Services through Subcontracts <br />ï! Mileage - Outside local area <br /> <br />I.I 5 x Cost <br />1.15 x Cost <br />I.I 5 x Cost <br /> <br />Per accepted IRS rate <br /> <br />Rates are effective through September 28, 2006. If contract assignment extends beyond that date. a new rate <br />schedule will be added to the contract Litigation support will be billed at $300.00 per hour. <br />Rates ba.sed on "Prevailing Wage" (PW) for CO/lStructioll Management and Surveying will be determÙted by <br />Project and County per California law. <br /> <br />---- <br /> <br />....._"-- <br /> <br />. '"-_...~_.~-'".._-"--_.. <br /> <br />I'JOlTE <br /> <br />7 of9 <br /> <br />N:\BDNCS\Redwood City\Downtown Precise Plan\DeIv\Final Scope - Vel' 2_02-28-06.doc <br /> <br />..,..JND """""""..'"G <br />
The URL can be used to link to this page
Your browser does not support the video tag.