My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt18 RK Engineering, Inc.
>
City Clerk
>
Agreements
>
2010-2019
>
2018
>
Agmt18 RK Engineering, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2018 11:47:11 AM
Creation date
9/20/2018 11:44:50 AM
Metadata
Fields
Template:
Agreement
Contractor Name
RK Engineering, Inc.
PROJECT NAME
Alameda de las Pulgas sidewalk improvement project
RMP File Number
304
Date
9/19/2018
MO Ref
18-147
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
AGREEMENT ORIGINAL <br />forthe <br />City of Redwood City <br />ALAMEDA DE LAS PULGAS SIDEWALK IMPROVEMENT PROJECT <br />THIS AGREEMENT, made this-L'j- day of 018, by and between RK <br />Engineering, Inc. whose place of business is at 726 31 Avenue, San Francisco, CA 94121 <br />hereinafter called "CONTRACTOR", and the City of Redwood City, a Charter City and municipal <br />corporation of the State of California, hereinafter referred to as "CITY". <br />follows: <br />In consideration of the mutual covenants hereinafter set forth, Contractor and City agree as <br />A. Contractor shall complete all Work specified in the Contract documents, in <br />accordance with the Specifications, Drawings, and all other terms and conditions of <br />the Contract documents. <br />II. CONTRACT SUM <br />A. City shall pay the Contractor as the "Contract Sum" for completion of Work in <br />accordance with the Contract documents, as the amount of Three Hundred Fifty <br />Six Thousand Three Hundred Sixty Eight Dollars ($356, 368.00), computed in <br />accordance with Contractor's Accepted Pfege6al Bid dated, August 1, 2018, which <br />Pfepesal Bid is incorporated herein by reference thereto as if fully set forth. <br />B. The Contract Sum is all inclusive and includes all Work; all federal, state, and local <br />taxes on materials and equipment, and labor furnished by Contractor, its <br />subcontractors, subconsultants, architects, engineers, and vendors or otherwise <br />arising out of Contractor's performance of the Work, including any increases in any <br />such taxes during the term of this Agreement; and any duties, fees, and royalties <br />imposed with respect to any materials and equipment, labor or services. The taxes <br />covered hereby include (but are not limited to) occupational, sales, use, excise, <br />unemployment, FICA, and income taxes, customs, duties, and any and all other taxes <br />on any item or service that is part of the Work, whether such taxes are normally <br />included in the price of such item or service or are normally stated separately. <br />Notwithstanding the foregoing, each party shall bear such state or local inventory, real <br />property, personal property or fixtures taxes as may be properly assessed against it <br />by applicable taxing authorities. <br />III. CONTRACT TIME AND LIQUIDATED DAMAGES <br />A. Contractor shall complete the Work within the following Schedule reflecting the date <br />the Contract Time commences to run as set forth in Section 00550 (Notice to <br />Proceed) and Section 00700 (General Conditions); and <br />Contractor shall achieve Substantial Completion of the Work within seventy-five <br />(75) Calendar Days from the date the Contract Time commences to run. <br />B. Liquidated Damaaes <br />1. City and Contractor recognize that time is of the essence of this Agreement <br />and that City will suffer financial loss in the form of lost revenues, contract <br />AGREEMENT <br />ALAMEDA DE LAS PULGAS <br />SIDEWALK IMPROVEMENT PROJECT <br />
The URL can be used to link to this page
Your browser does not support the video tag.