My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2018-09-24 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2018
>
AgdaPkt 2018-09-24 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2018 5:18:32 PM
Creation date
9/20/2018 5:27:29 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
9/24/2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
448
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Site 06: Bradford Street/ Redwood Creek <br />Top: On the East side of Convention Way Bridge, looking West <br />Bottom: Looking North toward the Convention Way Bridge <br />24 SEPTEMBER 2018 <br />EXECUTIVE SUMMARY <br />Finally, the report concludes by providing a consolidated list <br />of recommendations and next steps for Council to consider. <br />The recommendations outlined in the conclusion include a <br />variety of opportunities to create a more connected, vibrant and <br />environmentally focused Downtown core for the residents of <br />Redwood City to enjoy year-round. <br />ao <br />This report lays out the opportunity and constraints for each of <br />the three sites to be converted into public spaces and provides <br />alternatives for future park development within these spaces. <br />v <br />aD <br />For both sites 02 and 03, recommendations and alternate park <br />cD <br />program concepts have been prepared to demonstrate the wide <br />—1 <br />array of possibilities for site programming, while also adhering to <br />the list of preferred amenities identified during the community <br />outreach effort. During the March 12, 2018 City Council meeting, <br />Council requested that some investigation be made into the <br />possibility of daylighting Redwood Creek through Site 03, and the <br />possibility of building a park on a raised podium over the existing <br />Main Street Lot. After analyzing these concepts and calculating <br />rough cost estimates with a Civil Engineer, it was determined <br />that those ideas are cost prohibitive and therefore they were <br />not considered any further as part of this study. For Site 06, the <br />report identifies the preferred location for a future Redwood Creek <br />Trail and provides guidelines for trail development. Due to the <br />complexity of the development of a trail at this location, three <br />alternatives are proposed for the development of the trail along the <br />East Bank of Redwood Creek. <br />Finally, the report concludes by providing a consolidated list <br />of recommendations and next steps for Council to consider. <br />The recommendations outlined in the conclusion include a <br />variety of opportunities to create a more connected, vibrant and <br />environmentally focused Downtown core for the residents of <br />Redwood City to enjoy year-round. <br />
The URL can be used to link to this page
Your browser does not support the video tag.