Laserfiche WebLink
SITE 03: CITY HALL/MAIN STREET <br />Alternate Option <br />Program Description: <br />This park program concept combines many of the <br />key amenities noted in the community engagement <br />process into a formal linear park from City Hall Plaza <br />through the parking lots to Broadway. The overall <br />layout creates a clear pedestrian promenade from <br />the Library Plaza, through the City Hall Plaza to the <br />proposed City Hall park. This park has a passive <br />character with abundant garden and lawn spaces and <br />could complement the more actively programmed <br />Library park. Hardscape and small plazas along the <br />promenade provide numerous seating and gathering <br />areas. The formal linear forms of this layout enhance <br />and clarify the user experience and create a strong <br />connection between multiple civic uses that can <br />accommodate a variety of park users. <br />Parking Impacts: <br />There are currently 149 spaces in the Main Street <br />Lot and 16 spaces in the City Hall Lot, for a total of <br />165 spaces on site. The Alternate Option for the site <br />proposes reducing the number of existing spaces in <br />the Main Street Lot by approximately 71-79, resulting <br />in a total of approximately 70-78 spaces left on the <br />entire site. <br />24 SEPTEMBER 2018 <br />Cost Estimate: <br />V PROPOSED NEAR-TERM SITES <br />19,200 <br />$25 <br />$480,000 <br />$35 <br />$72,000 <br />25,700 <br />$40 <br />$1,028,000 <br />$50 <br />$1,285,000 <br />16,800 <br />$15 <br />$252,000 <br />$25 <br />$420,000 <br />10,500 1 $10 1 $105,000 1 $18 1 $189,000 <br />72,200 1 $90 1 $1,865,000 1 $128 1 $1,966,000 <br />* Note: <br />1. Developable site area is assumed to exclude existing buildings. <br />2. Preliminary probable construction costs shown do not include potable water storage. Refer to Tables 2a -b for additional probable potable water storage cost <br />information. <br />3. Preliminary probable construction costs shown do not include elevated park structure costs. Refer to Table 3 for preliminary cost information for an elevated park <br />structure within the City Hall Parking Lot/ Main Street site. <br />4. Preliminary Operation and Maintenance Costs for this park program concept are approximately $120,000 per year. Much of these maintenance costs are associated <br />with the proposed garden areas. <br />Precedent: Pancras Plaza, Kings Cross, UK <br />A formal linear plaza, with garden and lawn, can <br />integrate multiple uses and spaces. <br />SW <br />Precedent: Sky UK Headquarters, London <br />A garden plaza, like the one above, provides shade <br />and seating. <br />0 <br />v <br />cQ <br />(D <br />N <br />