Laserfiche WebLink
APPENDIX <br />Table 2b: <br />Preliminary Probable <br />Construction Cost for <br />Potable Water Storage @ <br />Site 03: City Hall/ Main <br />Street <br />Table 3: <br />Storage Tank 1,000,000 $1.50 <br />Treatment System Lump Sum <br />Electrical 1,000,000 $0.23 <br />Piping and Related I 1,000,000 $0.15 <br />Infrastructure <br />Total Cost per Potable Water <br />Storage System <br />I I <br />Note: <br />1. Cost assumes one potable water storage system <br />2. Storage tank size assumed is based on approximate available underground space <br />Preliminary Probable <br />Construction Cost for <br />Elevated Park Structure Ground Level Parking <br />at Site 03: City Hall/ Main - <br />Street Site Single Elevated Deck with <br />Park Setting <br />Total <br />$1,500,000 <br />$100,000 <br />$225,000 <br />$150,000 <br />$1,975,000 <br />30,000 $30 $900,000 <br />30,000 $270 $8,100,000 <br />$9,000,000 <br />Note: <br />1. Preliminary Probable Construction Cost assumes ground level parking with one level of structure with landscape <br />setting. <br />24 SEPTEMBER 2018 <br />ON <br />ON <br />v <br />(D <br />O <br />N <br />