My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt18 Verde Design, Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2018
>
Agmt18 Verde Design, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2018 5:27:27 PM
Creation date
9/25/2018 5:19:59 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Verde Design, Inc.
PROJECT NAME
Renovation of synthetic turf fields at Hoover Field
RMP File Number
304
Date
9/24/2018
MO Ref
18-165
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
G. PROFESSIONAL COMPENSATION <br />Verde Design proposes the following fixed fee schedule for the identified design services <br />that will provide the following improvements: <br />Phase <br />Fee Amount <br />Project Start-up / Site Assessment: <br />$11,400 <br />Initial Design: <br />$19,130 <br />Pre -final Design: <br />$11,080 <br />Final Package: <br />$ 7,440 <br />Bid Support / Construction Administration: <br />$11,090 <br />Reimbursable Allowance: <br />$ 1,320 <br />FEE SUBTOTAL: <br />$61,460 <br />The above fee is based on the anticipated work effort that will be required to successfully <br />complete this project, and includes all reasonable reimbursable expenses that are <br />outlined to be included in the project scope and the provided products. Additional <br />requested reimbursables will be entitled to bill reimbursable expenses as noted on the <br />attached Charge Rate Schedule in Exhibit B. Additional services will be charged on a <br />time and material basis. <br />Should the project be delayed beyond the agreed upon project schedule by the City to a <br />level that puts the project on hold, as determined by the City, a re -start fee will apply. This <br />fee will be determined at that point based on the amount of downtime and additional work <br />required to bring the project on line. <br />Page 14 of 15 <br />REV: 08-29-18 PR <br />ATTY/AGR.2018.203Nerde Design, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.