My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt18 Seton Pacific Construction Corporation
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2018
>
Agmt18 Seton Pacific Construction Corporation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2018 5:24:40 PM
Creation date
9/25/2018 5:20:22 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Seton Pacific Construction Corporation
PROJECT NAME
Rule 20 Middlefield Rd Phase I
RMP File Number
304
Date
9/24/2018
MO Ref
18-127
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ORIGINAL <br />AGREEMENT <br />forthe <br />City of Redwood City <br />RULE 20 MIDDLEFIELD ROAD PHASE 1 <br />UNDERGROUND UTILITY DISTRICT PROJECT <br />THIS AGREEMENT, made this 2 I ' "day of 1Y10 YNY 4 , 2018, by and between Seton <br />Pacific Construction Corporation whose place of businbss is at 2095 Jerrold Avenue, Suite 317, <br />San Francisco, CA 94124 hereinafter called "CONTRACTOR", and the City of Redwood City, a <br />Charter City and municipal corporation of the State of California, hereinafter referred to as "CITY". <br />In consideration of the mutual covenants hereinafter set forth, Contractor and City agree as <br />follows: <br />WORK <br />A. Contractor shall complete all Work specified in the Contract documents, in <br />accordance with the Specifications, Drawings, and all other terms and conditions of <br />the Contract documents. <br />CONTRACT SUM <br />A. City shall pay the Contractor as the "Contract Sum" for completion of Work in <br />accordance with the Contract documents, as the amount of Seven Million Six <br />Hundred Twenty Five Thousand Three Hundred Fourteen Dollars, ($7,625,314) <br />computed in accordance with Contractor's Accepted Pfepesal Bid dated, July 10, <br />2018, which Pmpesal Bid is incorporated herein by reference thereto as if fully set <br />forth. <br />B. The Contract Sum is all inclusive and includes all Work; all federal, state, and local <br />taxes on materials and equipment, and labor furnished by Contractor, its <br />subcontractors, subconsultants, architects, engineers, and vendors or otherwise <br />arising out of Contractor's performance of the Work, including any increases in any <br />such taxes during the term of this Agreement; and any duties, fees, and royalties <br />imposed with respect to any materials and equipment, labor or services. The taxes <br />covered hereby include (but are not limited to) occupational, sales, use, excise, <br />unemployment, FICA, and income taxes, customs, duties, and any and all other taxes <br />on any item or service that is part of the Work, whether such taxes are normally <br />included in the price of such item or service or are normally stated separately. <br />Notwithstanding the foregoing, each party shall bear such state or local inventory, real <br />property, personal property or fixtures taxes as may be properly assessed against it <br />by applicable taxing authorities. <br />III. CONTRACT TIME AND LIQUIDATED DAMAGES <br />A. Contractor shall complete the Work within the following Schedule reflecting the date <br />the Contract Time commences to run as set forth in Section 00550 (Notice to <br />Proceed) and Section 00700 (General Conditions); and <br />AGREEMENT <br />MUUD -PHASE 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.