My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2018-10-01 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2018
>
AgdaPkt 2018-10-01 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/2/2018 9:21:59 AM
Creation date
9/27/2018 4:55:21 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
10/1/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
175
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Bioretention Area Maintenance Plan - Page 4 C:\Users\joconnell\Desktop\Kennedy School STMMA and Easement\Agreement\AppG02Biorettemplate6.1.doc Bioretention Area Inspection and Maintenance Checklist Property Address: Property Owner: Treatment Measure No.: Date of Inspection: Type of Inspection: Monthly Pre-Wet Season After heavy runoff End of Wet Season Inspector(s): Other: Defect Conditions When Maintenance Is Needed Maintenance Needed? (Y/N) Comments (Describe maintenance completed and if needed maintenance was not conducted, note when it will be done) Results Expected When Maintenance Is Performed 1. Standing Water When water stands in the bioretention area between storms and does not drain within five days after rainfall. There should be no areas of standing water once inflow has ceased. Any of the following may apply: sediment or trash blockages removed, improved grade from head to foot of bioretention area, or added underdrains. 2. Trash and Debris Accumulation Trash and debris accumulated in the bioretention area. Trash and debris removed from bioretention area and disposed of properly. 3. Sediment Evidence of sedimentation in bioretention area. Material removed so that there is no clogging or blockage. Material is disposed of properly. 4. Erosion Channels have formed around inlets, there are areas of bare soil, and/or other evidence of erosion. Obstructions and sediment removed so that water flows freely and disperses over a wide area. Obstructions and sediment are disposed of properly. 5. Vegetation Vegetation is dead, diseased and/or overgrown. Vegetation is healthy and attractive in appearance. 6. Mulch Mulch is missing or patchy in appearance. Areas of bare earth are exposed, or mulch layer is less than 3 inches in depth. All bare earth is covered, except mulch is kept 6 inches away from trunks of trees and shrubs. Mulch is even in appearance, at a depth of 3 inches. 7. Miscellaneous Any condition not covered above that needs attention in order for the bioretention area to function as designed. Meet the design specifications. REV: 07-27-18 PR ATTY/AGR/2018.162/REDWOOD CITY SCHOOL DISTRICT - STMMAPage 22 of 236.1.B. - Page 27
The URL can be used to link to this page
Your browser does not support the video tag.