My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
RecDoc 2018-075527 IA 601 ECR
RedwoodCity
>
City Clerk
>
Recorded Docs CC&Rs
>
Recorded Docs 2013-2020 Additional sub folders
>
Recorded Documents 2013-2023 (additional sub folders)
>
Improvement Agreement
>
RecDoc 2018-075527 IA 601 ECR
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2019 9:38:18 AM
Creation date
10/3/2018 5:07:43 PM
Metadata
Fields
Template:
Recorded Docs
Recorded Docs - Type
Agreement
Rec Date
9/27/2018
Address
601 El Camino Real
Parties
KB South Bay, Inc.
MO Ref
18-141
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AGREEMENT <br />NOW, THEREFORE, in consideration of the faithful perfnniance of the terms and conditions set <br />forth in this Agreement, the parties hereto agree as follows: <br />1. DgMose. The purpose of this Agreement is to guarantee completion of the Improvements <br />and ensure satisfactory, performance by Developer of Developer's obligations to satisfy the Conditions <br />pertaining to the Improvements. - <br />2. Procerty Subiect to Aereement. The Property shall be subject to this Agreement. <br />3. Dntv to hrstall dmorovements. Developer will construct, install and complete, or cause to <br />be constructed, installed and completed, at the Developer's sole cost and expense, the lmprovements, in <br />accordance with the Improvement Plans (defined in Recital E. above) and to the satisfiction of the City <br />Engineer, in his reasonable discretion. Developer will also supply all Iabor and materials therefor, all in <br />strict accordance with the terms and conditions of this Agreement. The Improvements shall include, but <br />are not necessarily limited to, all of the following: <br />(a) grading, paving <br />(b) curbs, gutters, concrete walkways, driveways <br />(c) sanitary sewer system, complete <br />(d) water system, complete <br />(e) storm drainage system, complete <br />(f) stormwatertreatment system, complete <br />(g) site lighting system, complete <br />(h) street trees <br />(i) landscaping and irrigation system complete <br />(j) utility joint trenching <br />(k) all Conditions of the Tentative Map <br />(1) and all other work, improvements, or construction required by or specified in the <br />abovementioned plans and specifications, conditions of permits and all construction, <br />appurtenances and improvements necessary as reasonable determined by the City <br />Engineer to complete the aforementioned improvements, both within and outside of <br />the Property. <br />The construction, installation and completion of the Improvements and all Iabor and materials finnished <br />in connection therewith are hereinafter referred to collectively as the "Work." The Work and <br />Improvements shall be in strict compliance with the provisions of Chapter 30 of the Redwood City Code. <br />In the event a conflict exists between the Improvement Plans and the requirements of Chapter 30 of the <br />REV: 06-20-19 PR <br />Page 2 of 1S <br />ATN/AGR.2018.136/601 El Camino Subdivision Improvement Agreement <br />
The URL can be used to link to this page
Your browser does not support the video tag.