My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
IA_10.12.2018
RedwoodCity
>
City Clerk
>
Recorded Docs CC&Rs
>
Recorded Docs 2013-2020 Additional sub folders
>
Recorded Documents 2013-2023 (additional sub folders)
>
Maintenance Agreement
>
IA_10.12.2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2018 8:13:07 AM
Creation date
10/15/2018 8:12:08 AM
Metadata
Fields
Template:
Recorded Docs
Recorded Docs - Type
Agreement
Subject
Kaiser Permanente Hospitals
Rec Date
10/12/2018
Parties
Kaiser Permanente Hospitals
MO Ref
18-182
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
strict accordance with the terms and conditions of this Agreement. The Improvements shall include, but <br />are not necessarily limited to, all of the following: <br />(a) grading, paving <br />(b) curbs, gutters, concrete walkways, driveways <br />(c) sanitary sewer system, complete <br />(d) permeable pavers <br />(e) water system, complete <br />(f) storm drainage system, complete <br />(g) site lighting system, complete <br />(h) street trees <br />(i) landscaping and irrigation system complete <br />0) utility joint trenching <br />(k) and all other work, improvements, or construction required by or specified in the <br />abovementioned plans and specifications, conditions of permits and all construction, <br />appurtenances and improvements necessary as reasonable determined by the City <br />Engineer to complete the aforementioned improvements, both within and outside of <br />the Property. <br />Developer will complete the Work (defined below) in two (2) phases, namely the Initial Improvements <br />and Ultimate Improvements (defined in Recital D above). Initial Improvements includes but is not <br />limited to improvements along Marshall Street from Walnut Street to the east of Maple Street, Maple <br />Street from south of Marshall Street to Veterans Boulevard, and Marshall Court. Ultimate Improvements <br />includes but is not limited to improvements on Maple Street from Marshall Street to Veterans Boulevard, <br />Veterans Boulevard, and Marshall Court. <br />The construction, installation and completion of the Improvements and all labor and materials furnished <br />in connection therewith are hereinafter referred to collectively as the "Work." The construction, <br />installation and completion of the FF Eligible Improvements only and all labor and materials furnished in <br />connection therewith are hereinafter referred to collectively as the "FF Work". The Work and <br />Improvements, which include the FF Eligible Improvements and the FF Work, shall be in strict <br />compliance with the provisions of the Redwood City Code. In the event a conflict exists between the <br />Improvement Plans and the requirements of the Redwood City Code, the stricter requirement or standard <br />shall govern, as determined by the City Engineer. <br />4. Completion Date. Developer will complete the Initial Improvements portion of the Work <br />within three years of the Effective Date, and will complete the Ultimate Improvements portion of the <br />Work within five years of the Effective Date. Developer will complete FF Work within the Initial <br />Improvements portion of the Work. All Work will be completed in a good and workmanlike manner in <br />accordance with accepted design and construction practices and consistent with the Improvement Plans. <br />This completion date may be extended by the City Engineer in his or her sole and absolute discretion at <br />REV: 08 -29 -18 PR <br />Page 3 of 24 <br />ATTY /AGR.2018.202 /Kaiser MOB2 - IA <br />
The URL can be used to link to this page
Your browser does not support the video tag.