Laserfiche WebLink
• Hired consultant in Fall 2016 to evaluate potential <br />enhanced crossing locations <br />• Evaluation completed in July of 2017 <br />• Whipple at Iris (West leg) determined best location <br />for crossing <br />• Fall of 2017 hired consultant to complete the design of <br />the enhanced crossing <br />• Design completed in July of 2018 <br />• Project put out for bid in August 2018 <br />