Laserfiche WebLink
C�' <br />- Page 39 COMMERCIAL <br />1. 1 1 PUMP & MECHANICAL INC. <br />City of Redwood City <br />Request for Proposal <br />Project Listing <br />City of Tracy — Storm Water Pump Maintenance / Repair <br />2013 - $229,470 <br />Contact — Moheb Argand — Civil Engineer - (209) 831-6467 <br />Natomas Central Mutual Water Company — Lift Pump Maintenance / Repair <br />2009 — 2018 - $1,759,540 <br />Contact Brett Grey General Manager - (916) 419-5936 <br />Chester 3 — Work Plan <br />11254 Midway 530.899.1583v <br />Chico CA 95928 j 530.899.7225f <br />Page 2 <br />An initial service call is performed to assess the running condition of the purnp, site access, and <br />possible reason for the failure. The pump is then removed using our forces and transported to our shop <br />in Chico, CA. Disassembly and Inspection is performed and a detailed as found report with <br />recoinrnendations for repairs and or replacement of parts. We have on site a full machine and <br />fabrication shop, which enables us to repair and or fabricate most all parts needed for the repair of <br />storm water pumps. <br />Chapter 4 — Project Staffing <br />Steven Greenwood — President / CEO <br />33 Years' Experience <br />Chris Reinbold — Operations Manager <br />16 Years' Experience <br />David Jessen — Lead Operator <br />5 Years' Experience <br />Michael Lozano Lead Operator <br />4 Years' Experience <br />- Continued - <br />11254 Midway, Chico CA 95928 1 530.899.1583v I 530.899.7225f I www.cpmpump.com <br />