My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt18 City of Menlo Park
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2018
>
Under 60 K
>
Agmt18 City of Menlo Park
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/22/2018 9:13:40 AM
Creation date
10/22/2018 9:13:10 AM
Metadata
Fields
Template:
Agreement
Contractor Name
City of Menlo Park
PROJECT NAME
Atherton Channel Agreement
RMP File Number
304.5
Date
10/15/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Notification #1600 - 2013 - 0356 -R3 <br />Streambed Alteration Agreement <br />Page 8 of 23 <br />Exhibit A -1 <br />(adults and young, when present) at the nest site to ensure that they <br />are not disturbed by project - related activities. Nest monitoring shall <br />continue during project - related construction work until the young <br />have fully fledged, are no longer being fed by the parents and have <br />left the nest site, as determined by a biological monitor. <br />2.11 Nesting habitat Removal or Modification. No trees, shrubs or <br />wetland habitat shall be disturbed that contain active bird nests until <br />all eggs have hatched, and young have fully fledged (are no longer <br />being fed by the adults, and have completed left the nest site). To <br />avoid potential impact to tree or shrub - nesting birds, any trimming or <br />pruning of trees or shrubs shall be conducted Auring the time period <br />of September 16 to February 14. No habitat removal or modification <br />shall occur within the ESA fenced nest zone even if the nest <br />continues to be active beyond the typical nesting season for the <br />species (refer to Measure 2.8), until the young have fully fledged and <br />will no longer be adversely affected by the project. <br />2.12 Bat Surveys. The qualified biologist shall surrey the bridges for bats <br />within a minimum of 30 days prior to the beginning of Project <br />construction work planned either on or within 50 feet of the <br />Bridge. The biologist shall make an effort to identify the bat species <br />and its use of the bridge (maternity, bachelor, day roosting), but shall <br />avoid disturbing bats during surveys. The pallid bat forms maternity <br />or bachelor colonies from spring (March to May) until October, and <br />although the young are weaned at 6 to 8 weeks of age, they are not <br />self - sufficient until the fall. Bats may hibernate in the same structure <br />as the spring /summer roost or in another nearby location. Permittee <br />or qualified biologist shall notify CDFW within 24 hours if bats are <br />found during surveys. CDFW may submit additional written <br />avoidance, minimization and mitigation measures if bats are found in <br />the project area. Those additional measures shalt be considered <br />part of this Agreement. <br />2.13 Bat Protection. Bats shall not be disturbed by any project - related <br />activities without specific notice to and consultation with <br />CDFW. Project activities shall not start under the bridges, or within <br />50 feet of the bridges, if bats are found nesting /roosting within <br />them. If bats are documented using the bridge or bridges, the <br />qualified biologist shall conduct weekly surveys until the bats have <br />left the area for the fall /winter season. <br />2.14 Stream Diversion. If water is present in the channel during project <br />activities, the water shall be diverted around the work area to isolate <br />it. To isolate the work area, water tight coffer dams shall be <br />constructed upstream and downstream of the work area and water <br />Page 17 of 34 <br />ATTY /AGR /2018.243/CITY OF MENLO PARK_ATHERTON CHANNEL GSA <br />
The URL can be used to link to this page
Your browser does not support the video tag.