My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt18 City of Menlo Park
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2018
>
Under 60 K
>
Agmt18 City of Menlo Park
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/22/2018 9:13:40 AM
Creation date
10/22/2018 9:13:10 AM
Metadata
Fields
Template:
Agreement
Contractor Name
City of Menlo Park
PROJECT NAME
Atherton Channel Agreement
RMP File Number
304.5
Date
10/15/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Exhibit A <br />6. Allow wildlife to leave the project site unharmed if encountered during the maintenance <br />activities. <br />7. Coordination of Work: <br />In order to satisfy specific conditions within the SAA, the City will utilize a biological <br />services firms under separate contract. The general scope of work to be performed by <br />the qualified biologists and biological monitors includes pre- construction bat surveys and <br />reports, construction work area layout, education training, on -site biological construction <br />monitoring and post- construction reporting. The City of Redwood City will need to <br />coordinate their schedule for performing the maintenance cleaning activities with the <br />selected biological services firm to ensure conformance with all requirements in the <br />SAX This includes providing adequate notice and coordination to ensure availability of <br />the biological services firm to perform a pre- construction bat survey within 30 days of <br />starting on -site work, to layout the work area, and to perform education training and site <br />monitoring during all on -site maintenance cleaning activities. <br />Protection of Channel <br />Pursuant to the CDFW SAA, the following measures shall be taken to protect the Channel: <br />1. A clamshell bucket, hand tools or a small mower shall be used to remove vegetation from <br />the Channel. <br />2. No equipment shall be placed or operated in the Channel. <br />3. Mowing shall only occur on top of bank above ordinary high water level and shall not occur <br />within the Channel or lower bank. <br />4. Staging and storage areas for equipment, materials, fuels, lubricants and solvents shall <br />be located away from the wetted areas. <br />Any equipment or vehicles operated adjacent to the creek areas shall be checked and <br />maintained daily to prevent leaks of materials into the water. Vehicles must be moved 150 <br />feet away from the stream prior to refueling and lubrication. <br />6. All workers shall decontaminate waders, boots and other clothing that will come in direct <br />contact with the water to prevent the spread of aquatic diseases. The decontamination of <br />clothing and equipment shall comply with the methods included in the attached SAA - <br />Avoidance and Minimization Measures Item 2.6. These methods are summarized below, <br />and one or more of these methods shall be used: <br />a. All equipment shall be dried in an upland location following last aquatic use. The <br />minimum drying time depends on the average daytime temperatures, at least 7 <br />days of drying time for average daytime temperatures more than 80 IF and at least <br />30 days of drying time for average daytime temperatures less than 80 °F. <br />Page 7 of 34 <br />ATTY /AGR /2018.243/CITY OF MENLO PARK_ATHERTON CHANNEL GSA <br />
The URL can be used to link to this page
Your browser does not support the video tag.