My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt06 Nolte Associates
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2006
>
Agmt06 Nolte Associates
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2006 9:51:13 AM
Creation date
4/12/2006 9:50:02 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Nolte Associates
PROJECT NAME
consulting engineering - downtown precise plan
RMP File Number
304
Date
4/7/2006
MO Ref
06-058 RD-06-002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />APPENDIX 1 <br /> <br />UTILITIES AND SERVICE SYSTEMS <br />SCOPE OF SERVICES <br /> <br />CITY OF REDWOOD CITY <br />FEBRUARY 27, 2006 <br /> <br />I. <br /> <br />INTRODUCTION <br /> <br />This Scope of Services is presented in response to the request for proposal to provide technical <br />support services for a "stand alone" engineering report to support the initiatives of the City of <br />Redwood City in the renewal of its Downtown area. Nolte subscribes to the philosophy of <br />sustainable engineering and welcomes this opportunity to contribute to the efforts of the <br />community of Redwood City for its future. <br /> <br />II. <br /> <br />STUDY APPROACH <br /> <br />As per the direction provided during the pre-bid meeting, the tasks for the study are presented in <br />the order and work groups identified in the Scope of Services outlined in the Request for <br />Proposals. <br /> <br />TABLE 1 - OUTLINE OF TASKS <br /> <br />Task 1 Major Utilities Function Chapters <br />Task 2 Summary of Loading Criteria and Conditions <br />Task 3 Existing Computer Modeling Results <br />Task 4 Water System Analysis <br />Task 5 Sewer System Analysis <br />Task 6 Stormwater System Analysis <br />Task 7 Identify Impacts to Utility Systems <br />Task 8 Development of Alternative Solutions <br />Task 9 Recommendations for Mitigation of Impacts <br />Task 10 Meetings with Staff/ErR Consultant <br />Task 11 Prepare Responses to Public Comment <br />Task 12 Meetings with Planning Commission & City <br />Council <br /> <br />III. <br /> <br />TASK DESCRIPTIONS <br /> <br />Task 1 - Major Utilities Function Chapters <br /> <br />In this task Nolte will prepare a comprehensive report for each of the major utilities outlines in <br />the Scope of Work. These include water, sewer, and storm water. Stormwater will include both <br />drainage in pipes and NPDES requirements. These chapters will be prepared after the <br />completion of the analyses of the major utilities as listed in the tasks below. <br /> <br />Task 2 - Summary of Loading Criteria and Conditions <br /> <br />For each utility system, the loading criteria will be summarized and presented in a tabulation <br />along with the various assumptions and design considerations. The existing "base line" <br /> <br />I'JCJI.TE <br /> <br />10f9 <br /> <br />B'YOND ENGIN"RING <br /> <br />N:\BDNCS\Redwood City\Downtown Precise P1an\Delv\Final Scope - Ver 2_02-28-06.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.