My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt17 MP Bradford Associates, LP - DDA
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2017
>
Agmt17 MP Bradford Associates, LP - DDA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2022 11:58:09 AM
Creation date
11/5/2018 11:27:03 AM
Metadata
Fields
Template:
Agreement
Contractor Name
MP Bradford and Associates, L.P.
PROJECT NAME
DDA Bradford St between Main St. and Jefferson Ave. (Bradford Senior Housing)
RMP File Number
304
Date
10/3/2017
Reso Ref
15621, 16026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
112
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
entitlements and approvals necessary for the development and operation of the Project as <br />contemplated by this Agreement. <br />5.4 Conditions of Approval. Developer shall develop the Property in accordance with <br />the terms and conditions of this Agreement and in compliance with the terms and conditions of all <br />approvals, entitlements and permits that the City or any other governn-iental body or agency with <br />jurisdiction over the Project or the Property has granted or issued as of the date hereof or may <br />hereafter grant or issue in connection with development of the Project, including without <br />limitation, all mitigation measures imposed in connection with environmental review of the Project <br />and all conditions of approval imposed in connection with any entitlements, approvals or permits <br />(all of the foregoing approvals, entitlements, permits, mitigation measures and conditions of <br />approval are hereafter collectively referred to as the "Conditions of Approval"). <br />5.5 Fees. Developer shall be solely responsible for, and shall promptly pay when due, <br />all customary and usual fees and charges of City and all other agencies with jurisdiction over <br />development of the Property in connection with obtaining building permits and other approvals <br />for the Project, including without limitation, those related to the processing and consideration of <br />amendments, if any, to the current entitlements, any related approvals and permits, environmental <br />review, architectural review, historic review, and any subsequent approvals for the Project. <br />5.6 Construction Plans. Developer shall submit to City's Building Division detailed <br />construction plans for the Project (the "Construction Plans"). As used herein "Construction <br />Plans" means all construction documents upon which Developer and Developer's contractors shall <br />rely in constructing the Project (including the landscaping, parking, and common areas) and shall <br />include, without limitation, the site development plan, final architectural drawings, landscaping, <br />exterior lighting and signage plans and specifications, materials specifications, final elevations, <br />and building plans and specifications. The Construction Plans shall be based upon the scope of <br />development set forth herein and upon the approvals issued by the City for the Project, and shall <br />not materially deviate therefrom without the express written consent of City. <br />5.7 Construction Pursuant to Plans. Developer shall develop each component of the <br />Project in accordance with the approved Construction Plans, the Conditions of Approval, and all <br />other permits and approvals granted by the City pertaining to the Project. Developer shall comply <br />with all directions, rules and regulations of any fire marshal, health officer, building inspector or <br />other officer of every governmental agency having jurisdiction over the Property or the Project. <br />Each element of the work shall proceed only after procurement of each permit, license or other <br />authorization that may be required for such element by any governmental agency having <br />jurisdiction. All design and construction work on the Project shall be performed by licensed <br />contractors, engineers or architects, as applicable. <br />5.8 Change in Construction Plans. If Developer desires to make any material change in <br />the approved Construction Plans, Developer shall submit the proposed change in writing to the <br />City for its written approval, which approval shall not be unreasonably withheld or delayed if the <br />Construction Plans, as modified by any proposed change, conform to the requirements of this <br />Agreement and any approvals issued by the City after the Effective Date. Unless a proposed <br />change is approved by City within thirty (30) days, it shall be deemed rejected. If rejected, the <br />previously approved Construction Plans shall continue to remain in full force and effect. Any <br />ATY/AGR/2017.218/RWC — BRADFORD — DDA <br />REV: 09-18-17 VR <br />Page 15 of 94 <br />
The URL can be used to link to this page
Your browser does not support the video tag.